flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Several barriers holding back widespread construction of zero energy buildings

Codes and Standards

Several barriers holding back widespread construction of zero energy buildings

Code improvements and voluntary programs could add momentum.


By Peter Fabris, Contributing Editor | November 1, 2018

Zero energy buildings are on the rise in some areas, but barriers that are retarding their spread nationwide remain.

That’s the conclusion of a new report, “Pathways to Zero Energy Buildings through Building Codes,” by the American Council for an Energy Efficient Economy. One barrier is a “solar-only” mindset where an owner adds solar to a building but gives short shrift to energy efficiency.

Debate over whether community renewable energy options should be favored over on-site renewable generation in net zero buildings is another barrier. The report says that zero energy can be accomplished with both power-generation strategies. Buildings can be made zero-energy ready, with generation added later.

Disinterest in energy-efficient or zero energy buildings still exists in many regions. Code improvements and voluntary programs could help overcome that barrier. Code updates could focus on specific building equipment, such as improving management of plug-load energy use, increasing HVAC efficiency, or including solar-ready roofing and connections. They could also be used to improve performance path scores or create an outcome-based performance path.

Related Stories

Codes and Standards | Mar 29, 2018

Contractors have paid $5.2 million for failing local resident employee mandate on Detroit arena

Companies were only able to meet half of the 51% local worker requirement over course of the project.

Codes and Standards | Mar 28, 2018

Washington State moving to promote mass timber construction with legislation

Bill would require all 12-story or less public buildings to be built with mass timber.

Codes and Standards | Mar 27, 2018

Los Angeles appoints its first chief design officer

Responsibility for enhancing civic architecture and urban design.

Codes and Standards | Mar 26, 2018

National Roofing Contractors Assn., releases updates to its Roof Wind Designer app

Significant changes to online wind-load calculator.

Codes and Standards | Mar 22, 2018

Global construction waste to almost double by 2025

Concerns in Houston, Minnesota over environmental impacts.

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021