flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

See who's attending BD+C's Under 40 Leadership Summit in SF

See who's attending BD+C's Under 40 Leadership Summit in SF

The list of AEC firms participating in our 3rd Annual Under 40 Leadership Summit continues to grow.


By BD+C Staff | September 24, 2013

There's still time to register for our 3rd Annual Under 40 Leadership Summit, October 9-11 in San Francisco.

The list of AEC firms participating in this year's event continues to grow. The following companies are sending at least one of their rising stars to the Summit (many are sending multiple people): 

 

 

Autodesk
Balfour Beatty
CTA Inc.
Esken + Dumez + Ripple
Gensler
HDR
Hill International
HMC Architects
hnedak bobo group
Jacobs Global Buildings
JE Dunn
KLMK Group
Level 10 Construction
Manhattan Construction
Martin/Martin
NTD
PHX Architecture
SmithGroupJJR
Southland Industries
SSOE Group
Stantec
Swinerton
Teabuild
Walter P Moore

If you know of up-and-coming leaders at your firm, please pass the U40 Leadership Summit registration link on: http://www.bdcnetwork.com/Under40Summit/index.html. 

Attendees can earn up to 10.5 AIA CES Learning Units and participate in exclusive tours of Autodesk Gallery and the Mission Bay/UCSF Science & Technology-Healthcare-Mixed Use District.

PLUS, the Summit’s Vision U40 Competition, to be facilitated by Autodesk Fellow Tom Wujec (see his video at www.BDCnetwork.com/under40summit), will group Summiteers into teams to develop advanced concepts to solve major societal and global problems in eight categories: Access + Mobility, Aesthetics + Beauty, Climate Change + Environment, Food Equity, Human Health + Performance, Human Spirit + Quality of Life, Social Justice, and Technological Innovation. The winning team will share the $3,000 Vision U40 Prize and four runner-up teams will each share $500.

For the special rate of $195, register by September 27 (using code U40SF) at www.BDCnetwork.com/under40summit.

Related Stories

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021