flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sebastopol, Cailf., invites designers to submit ideas for renewing city center

Sebastopol, Cailf., invites designers to submit ideas for renewing city center


By By BD+C Staff | August 31, 2011
The Core Project, an international design competition to generate innovative ideas for renewing Sebastopol city center.

 

The City of Sebastopol, together with The Redwood Empire Chapter of the American Institute of Architects and a group of local business sponsors, is hosting The Core Project, an international design competition to generate innovative ideas for renewing the city center. A small town with a population of approximately 8,000 people, Sebastopol is the hub of western Sonoma County. It provides commercial and community access for roughly 50,000 people in outlying rural and residential areas but it retains a desirable small town feel.

The goal of The Core Project is to explore how the physical presence of Sebastopol can become a more economically thriving and aesthetically vibrant place, reflecting the naturally beauty of the region and the character of the community. Each entry should emphasize one or more of the following key elements: traffic, commerce, and strengthening the connection between built and natural landscapes. Additionally, entrants are urged to submit innovative, challenging but feasible proposals to implement real, comprehensive changes.

International entrants from diverse disciplines including student and professional architects, landscape architects, developers, engineers, urban planners, transportation planners, and artists are invited to participate. Multidisciplinary and collaborative design teams are strongly encouraged.

The competition is juried and cash prizes will be awarded. There will be a public exhibition and online publication of top award winners. A follow-up forum to determine possible implementation of design ideas is planned for early 2012. Cash prizes will be based upon number of entries and will be awarded at sole discretion of the jury.

The registration period is August 29 through October 17, 2011. The submission deadline is October 24, 2011 by 5 p.m. PST. Winners will be announced November 6, 2011.

For more information, to become a sponsor, or to enter, visit http://www.the-core-project.org.

Related Stories

| Dec 13, 2011

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021