flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sebastopol, Cailf., invites designers to submit ideas for renewing city center

Sebastopol, Cailf., invites designers to submit ideas for renewing city center


By By BD+C Staff | August 31, 2011
The Core Project, an international design competition to generate innovative ideas for renewing Sebastopol city center.

 

The City of Sebastopol, together with The Redwood Empire Chapter of the American Institute of Architects and a group of local business sponsors, is hosting The Core Project, an international design competition to generate innovative ideas for renewing the city center. A small town with a population of approximately 8,000 people, Sebastopol is the hub of western Sonoma County. It provides commercial and community access for roughly 50,000 people in outlying rural and residential areas but it retains a desirable small town feel.

The goal of The Core Project is to explore how the physical presence of Sebastopol can become a more economically thriving and aesthetically vibrant place, reflecting the naturally beauty of the region and the character of the community. Each entry should emphasize one or more of the following key elements: traffic, commerce, and strengthening the connection between built and natural landscapes. Additionally, entrants are urged to submit innovative, challenging but feasible proposals to implement real, comprehensive changes.

International entrants from diverse disciplines including student and professional architects, landscape architects, developers, engineers, urban planners, transportation planners, and artists are invited to participate. Multidisciplinary and collaborative design teams are strongly encouraged.

The competition is juried and cash prizes will be awarded. There will be a public exhibition and online publication of top award winners. A follow-up forum to determine possible implementation of design ideas is planned for early 2012. Cash prizes will be based upon number of entries and will be awarded at sole discretion of the jury.

The registration period is August 29 through October 17, 2011. The submission deadline is October 24, 2011 by 5 p.m. PST. Winners will be announced November 6, 2011.

For more information, to become a sponsor, or to enter, visit http://www.the-core-project.org.

Related Stories

| Jul 10, 2013

SmithGroupJJR hires Don Posson as Co-director of Sustainable Design

SmithGroupJJR has hired veteran mechanical engineer Don Posson, PE, CCP, CPD, LEED AP, as the firm’s co-director of sustainable design.

| Jul 10, 2013

World's best new skyscrapers [slideshow]

The Bow in Calgary and CCTV Headquarters in Beijing are among the world's best new high-rise projects, according to the Council on Tall Buildings and Urban Habitat. 

| Jul 10, 2013

TED talk: Architect Michael Green on why we should build tomorrow's skyscrapers out of wood

In a newly posted TED talk, wood skyscraper expert Michael Green makes the case for building the next-generation of mid- and high-rise buildings out of wood.

| Jul 9, 2013

Where are they now? 40 Under 40 alumni make their mark in D.C.

Every month we’ll be touching base with past 40 Under 40 honorees to see what’s been happening in their professional and personal lives since winning the award. This month, we feature two outstanding professionals: HKS's Shannon Kraus and Roger Chang from Westlake Reed Leskosky.

| Jul 9, 2013

AISC releases Design Guide on Blast Resistant Structures

Design professionals now have a valuable new resource on blast resistant structures with AISC Design Guide No. 26, Design of Blast Resistant Structures.

High-rise Construction | Jul 9, 2013

5 innovations in high-rise building design

KONE's carbon-fiber hoisting technology and the Broad Group's prefab construction process are among the breakthroughs named 2013 Innovation Award winners by the Council on Tall Buildings and Urban Habitat.

| Jul 8, 2013

RSMeans cost comparisons: offices, daycare centers, convenience stores, fast food

Construction market analysts from RSMeans offer construction costs per square foot for offices, daycare centers, convenience stores, fast food.

| Jul 8, 2013

RSMeans cost comparisons: hotels, motels, and apartment buildings

Construction market analysts from RSMeans offer construction costs per square foot for hotels, motels, and apartment buildings. 

| Jul 8, 2013

Learn from the world’s fastest animal: speed isn’t everything

Every schoolchild knows that the cheetah is the world’s fastest land animal—70 mph, no sweat. And, as we all know from National Geographic television documentaries, it is speed that makes Acinonyx jubatus such a fearsome hunter, right?

| Jul 3, 2013

Mid-year special: Top 13 stories for 2013 (so far)

Every six months, we like to take a look back at the stories that generated the most interest from our readers. Here's a roundup of the top 13 articles on BDCnetwork.com for the first six months of 2013. 

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021