flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sebastopol, Cailf., invites designers to submit ideas for renewing city center

Sebastopol, Cailf., invites designers to submit ideas for renewing city center


By By BD+C Staff | August 31, 2011
The Core Project, an international design competition to generate innovative ideas for renewing Sebastopol city center.

 

The City of Sebastopol, together with The Redwood Empire Chapter of the American Institute of Architects and a group of local business sponsors, is hosting The Core Project, an international design competition to generate innovative ideas for renewing the city center. A small town with a population of approximately 8,000 people, Sebastopol is the hub of western Sonoma County. It provides commercial and community access for roughly 50,000 people in outlying rural and residential areas but it retains a desirable small town feel.

The goal of The Core Project is to explore how the physical presence of Sebastopol can become a more economically thriving and aesthetically vibrant place, reflecting the naturally beauty of the region and the character of the community. Each entry should emphasize one or more of the following key elements: traffic, commerce, and strengthening the connection between built and natural landscapes. Additionally, entrants are urged to submit innovative, challenging but feasible proposals to implement real, comprehensive changes.

International entrants from diverse disciplines including student and professional architects, landscape architects, developers, engineers, urban planners, transportation planners, and artists are invited to participate. Multidisciplinary and collaborative design teams are strongly encouraged.

The competition is juried and cash prizes will be awarded. There will be a public exhibition and online publication of top award winners. A follow-up forum to determine possible implementation of design ideas is planned for early 2012. Cash prizes will be based upon number of entries and will be awarded at sole discretion of the jury.

The registration period is August 29 through October 17, 2011. The submission deadline is October 24, 2011 by 5 p.m. PST. Winners will be announced November 6, 2011.

For more information, to become a sponsor, or to enter, visit http://www.the-core-project.org.

Related Stories

MFPRO+ News | Dec 5, 2023

DOE's Zero Energy Ready Home Multifamily Version 2 released

The U.S. Department of Energy has released Zero Energy Ready Home Multifamily Version 2. The latest version of the certification program increases energy efficiency and performance levels, adds electric readiness, and makes compliance pathways and the certification process more consistent with the ENERGY STAR Multifamily New Construction (ESMFNC) program.

Architects | Dec 5, 2023

Populous celebrates its 40th anniversary with a photo exhibit of its works

The firm partnered with Getty Images to assemble more than 60 images, many capturing fan ardor.

Office Buildings | Dec 1, 2023

Amazon office building doubles as emergency housing for Seattle families

The unusual location for services of this kind serves over 300 people per day. Mary's Place spreads across eight of the office's floors—all designed by Graphite—testing the status quo for its experimental approach to homelessness support.

Mixed-Use | Nov 29, 2023

Mixed-use community benefits from city amenities and ‘micro units’

Salt Lake City, Utah, is home to a new mixed-use residential community that benefits from transit-oriented zoning and cleverly designed multifamily units.

Giants 400 | Nov 28, 2023

Top 100 Laboratory Design Firms for 2023

HDR, Flad Architects, DGA, Elkus Manfredi Architects, and Gensler top BD+C's ranking of the nation's largest laboratory architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Engineers | Nov 27, 2023

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Kimley-Horn, the national engineering, planning, and design consulting firm, today launched TREDLite EV, a cloud-based tool that helps organizations develop and optimize their EV charger deployment strategies based on the organization’s unique priorities.

Market Data | Nov 27, 2023

Number of employees returning to the office varies significantly by city

While the return-to-the-office trend is felt across the country, the percentage of employees moving back to their offices varies significantly according to geography, according to Eptura’s Q3 Workplace Index.

Resiliency | Nov 27, 2023

All levels of government need to act to cope with climate-driven flooding and sea level rise

The latest National Climate Assessment highlights the need for local, state, and federal governments to adopt policies to mitigate the effects of climate-driven flooding and sea level rise, according to a policy expert with the National Resources Defense Council.

Data Centers | Nov 22, 2023

How is artificial intelligence impacting data center design?

As AI is reshaping how we interact with machines and the world around us, the design of data centers needs to adapt to this fast-changing landscape. So, Page pairs expert thinking with high-performing solutions to meet the needs of rapidly advancing technologies.

Cultural Facilities | Nov 21, 2023

Arizona’s Water Education Center will teach visitors about water conservation and reuse strategies

Phoenix-based architecture firm Jones Studio will design the Water Education Center for Central Arizona Project (CAP)—a 336-mile aqueduct system that delivers Colorado River water to almost 6 million people, more than 80% of the state’s population. The Center will allow the public to explore CAP’s history, operations, and impact on Arizona.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021