flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Seaport World Trade Center will offer Bostonians 737,000 sf of waterfront mixed-use space

Mixed-Use

Seaport World Trade Center will offer Bostonians 737,000 sf of waterfront mixed-use space

Schmidt Hammer Lassen Architects is designing the project.


By David Malone, Associate Editor | February 18, 2019
Boston's Seaport WTC

All renderings courtesy Schmidt Hammer Lassen Architects

Built on the site of what was once the largest pier building in the world, Boston’s Seaport World Trade Center will be an expansive mixed-use development on Commonwealth Pier that will include office space, retail, dining, public amenities, and event space.

Commonwealth Pier currently houses corporate offices, shops, and restaurants. The revitalization will improve public access throughout the site, expand the retail offerings, and enhance site resiliency and sustainability.

 

See Also: Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

 

The new office space will connect workers directly to over 160,000 sf of outdoor public space that includes courtyards, walkways, green rest spaces, and a grand plaza. A new 24,500-sf public waterfront plaza is envisioned as the pier’s central gathering point.

 

Seaport WTC

 

Harborwalk, a paved pedestrian path, will run along the perimeter of the entire project. The path will be lined with custom seating, planters, and lighting. The walkway will occasionally expand at niches cut into the building’s facades where public seating, sheltered areas, signage, and connectivity to retail and dining will be provided.

Many of the pier building’s historic components will be preserved, such as the stone arches and cornice of the Headhouse. Columns and column connections of the original building will also be left exposed.

The Seaport World Trade Center marks Schmidt Hammer Lassen’s second U.S. project and is slated to begin construction in early 2020. CBT Architects is the executive architect and Sasaki is the landscape architect.

Tags

Related Stories

Reconstruction Awards | Dec 29, 2020

The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy

The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.

Mixed-Use | Dec 28, 2020

BIG designs new mixed-use development in Harlem

The project, dubbed The Smile, has recently completed construction.

Urban Planning | Dec 6, 2020

Ford lays out plans for mobility innovation district in Detroit

Its centerpiece is an abandoned train depot whose architecture and decay reflect two sides of this city’s past.

Mixed-Use | Oct 19, 2020

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Oct 2, 2020

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021