The new Interdisciplinary Science and Engineering Building at Northeastern University in Boston is the first phase of the university’s plan to develop 600,000 sf of new academic and research space.
Located on an existing surface parking lot, the site is connected to the main campus by a curved bridge. The 180,000-gsf ISEB will house four academic research disciplines: engineering, health sciences, basic sciences, and computer science.
All offices, staff workstations, conference rooms, break areas, cafés, and research labs look across the atrium.
The Building Team includes: Payette (architect), LeMessurier Consultants (SE), Arup (MEP/FP), Vanasse Hangen Brustlen (CE), Suffolk Construction (preconstruction adviser), Sullivan Code Group (code consultant), Vermeulens (cost estimating consultant), Soden (sustainability consultant), Howard/Stein-Hudson Associates (transportation planner/engineer), Stephen Stimson Associates (landscape architect), and Acentech (architectural acoustics and mechanical noise and vibration consult).
For more on the project, visit: http://www.northeastern.edu/isec.
Related Stories
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 5, 2012
Tishman constructing new courthouse in Philadelphia
Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.