The new Interdisciplinary Science and Engineering Building at Northeastern University in Boston is the first phase of the university’s plan to develop 600,000 sf of new academic and research space.
Located on an existing surface parking lot, the site is connected to the main campus by a curved bridge. The 180,000-gsf ISEB will house four academic research disciplines: engineering, health sciences, basic sciences, and computer science.
All offices, staff workstations, conference rooms, break areas, cafés, and research labs look across the atrium.
The Building Team includes: Payette (architect), LeMessurier Consultants (SE), Arup (MEP/FP), Vanasse Hangen Brustlen (CE), Suffolk Construction (preconstruction adviser), Sullivan Code Group (code consultant), Vermeulens (cost estimating consultant), Soden (sustainability consultant), Howard/Stein-Hudson Associates (transportation planner/engineer), Stephen Stimson Associates (landscape architect), and Acentech (architectural acoustics and mechanical noise and vibration consult).
For more on the project, visit: http://www.northeastern.edu/isec.
Related Stories
| Sep 18, 2012
MBMA partners with ORNL for whole building energy efficiency study
The results are intended to advance energy efficiency solutions for new and retrofit applications.
| Sep 18, 2012
MKK opens office in North Dakota
MKK is currently working on seven projects in North Dakota, including a hotel, restaurant, truck stop, office building, and apartment complex.
| Sep 18, 2012
Firestone Building Products launches new website
Deep product information and innovative customer support tools are highlights.
| Sep 13, 2012
Leo A Daly Company promotes Kraskiewicz to senior vice president
Kraskiewicz, who most recently served as chief operations officer for the Leo A Daly division, will guide brand management, business development, operations and financial performance for 18 offices worldwide.
| Sep 13, 2012
Acentech adds audiovisual expertise to Trevose, Penn. office
Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.
| Sep 13, 2012
Margulies Perruzzi Architects completes office design for Pioneer Investments
MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.
| Sep 12, 2012
Harvesting new ways to eliminate waste at the USDA
After installing 20 high-speed, energy-efficient hand dryers in restrooms throughout the USDA headquarters; the USDA reports seeing an immediate 50% reduction in the use of paper towels.
| Sep 11, 2012
RTKL appoints Lance Hosey as Chief Sustainability Officer and Senior Vice President
Author and authority on green design to spearhead RTKL Performance-driven DesignSM initiative.
| Sep 11, 2012
McQuade appointed CEO of Tishman Construction
McQuade will focus on driving the growth of the company into new markets and expanding market share in its current areas of operation.
| Sep 11, 2012
Ecosystem Management & Associates joins HDR
EM&A staff will do business as part of HDR Engineering and HDR Environmental, Operations and Construction.