The new Interdisciplinary Science and Engineering Building at Northeastern University in Boston is the first phase of the universityās plan to develop 600,000 sf of new academic and research space.Ā
Located on an existing surface parking lot, the site is connected to the main campus by a curved bridge. The 180,000-gsf ISEB will house four academic research disciplines: engineering, health sciences, basic sciences, and computer science.
All offices, staff workstations, conference rooms, break areas, cafĆ©s, and research labs look across the atrium.Ā
The Building Team includes: Payette (architect), LeMessurier Consultants (SE), Arup (MEP/FP), Vanasse Hangen Brustlen (CE), Suffolk Construction (preconstruction adviser), Sullivan Code Group (code consultant), Vermeulens (cost estimating consultant), Soden (sustainability consultant), Howard/Stein-Hudson Associates (transportation planner/engineer), Stephen Stimson Associates (landscape architect), andĀ Acentech (architectural acoustics and mechanical noise and vibration consult).
For more on the project, visit:Ā http://www.northeastern.edu/isec.
Ā
Ā
Related Stories
| Apr 8, 2014
40 Under 40 winners: Meet the contractors
Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.Ā
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
Iāve heard countless stories of conversations between project engineers and IT professionals who canāt come to an agreement on the level of security needed to protect their data while making it more accessibleānot only externally, but also internally.Ā
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.Ā
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.Ā
| Apr 1, 2014
Planned global commerce center breaks ground near Phoenix
When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S.Ā
| Apr 1, 2014
Paints, coatings and sealants: Choosing products and procedures for best performance
This course covers life cycle assessment, color selection, emissions, durability, resilience, corrosion resistance, specification standards, and other critical aspects of choosing coatings for interior and exterior walls, ceilings, and roofs.