Since last December 14, safety has become the paramount concern of every school official and school board member in this country. December 14, 2012, was the date on which 20-year-old Adam Lanza shot and killed 20 children and six adult staff members at Sandy Hook Elementary School, in Newtown, Conn. It was the second deadliest mass shooting by a single person in U.S. history, after the Virginia Tech tragedy of 2007.
Sandy Hook galvanized school officials, parents, public officials, and police departments, as they scrambled to figure out how to prevent a similar incident in their communities. Many asked: Could better design and construction of schools—preschool, elementary, and secondary—prevent or at least mitigate the casualty rate at another Sandy Hook? And could this be done not only for schools to be built in the future, where Building Teams would be working from a blank slate, but for the tens of thousands of extant schools from Maine to Hawaii, where physical conditions are often literally set in stone?
TOP K-12 SCHOOL SECTOR ARCHITECTURE FIRMS
2012 K-12 Revenue ($)1 DLR Group $38,250,0002 SHW Group $32,328,8433 PBK $31,760,0004 IBI Group $27,977,8605 HMC Architects $25,407,1646 Stantec $21,586,2097 Fanning/Howey Associates $20,247,0008 Perkins+Will $19,938,2119 Heery International $16,561,30310 LPA $14,438,017
TOP K-12 SCHOOL SECTOR ENGINEERING FIRMS
2012 K-12 Revenue ($)1 AECOM Technology Corp. $100,150,0002 URS Corp. $55,927,7783 STV $45,937,0004 Jacobs Engineering Group $36,550,0005 Parsons Brinckerhoff $19,100,0006 TTG $9,985,3007 Shive-Hattery $7,379,4258 BRPH $4,900,0009 KCI Technologies $4,200,00010 Dewberry $3,852,971
TOP K-12 SCHOOL SECTOR CONSTRUCTION FIRMS
2012 K-12 Revenue ($)1 Gilbane $947,077,0002 Balfour Beatty $483,944,4763 Turner Corporation, The $357,910,0004 CORE Construction Group $284,198,3755 Skanska USA $273,418,3516 McCarthy Holdings $260,000,0007 Kraus-Anderson Construction $211,000,0008 JE Dunn Construction $169,860,4369 Consigli Construction $148,883,46810 Barton Malow $139,236,049
These questions inspired a gathering of public officials, school designers and contractors, safety experts, and facility directors convened last February in Washington, D.C., by the Council of Educational Facilities Planners International. The daylong CEFPI Security Summit provided a framework in which to consider what school districts can do to provide a safer environment for children, teachers, and administrative staff. Following are the recommendations of immediate interest to the design and construction community.
Infrastructure needs beefing up, says CEFPI report
Emergency preparedness and response must be woven into the very fabric of school life, according to the CEFPI Security Summit report. The report recommends creating “concentric circles of protection” through the following means:
- Providing the ability to lock students behind doors to protect them from aggression (door hardware companies report that they cannot keep up with demand for lock systems since Sandy Hook)
- Shielding students from large windows
- Safeguarding children when they meet in large groups for meals and assemblies
- Installing high-security keying systems with control measures in place for master keys
- Securing children, teachers, and staff via secured vestibules and remote access to select exterior and interior doors (through keyless entry systems)
- Eliminating access to unauthorized persons by improving line-of-sight conditions and installing CCTV cameras
- Protecting entrances through the use of bollards and safeguarding the exterior and perimeter—including playgrounds, athletic fields, and parking lots—via upgraded lighting and camera monitoring
Mass notifiation high on school districts' agenda
The CEFPI report also recommends action on crisis communications, notably:
- Providing an effective public address system, with a backup power source
- Use of multiple communications devices, including mobile panic devices worn by key administrators
- Installation of security cameras and use of emergency radio channels
School districts are already acting. Plainfield District 202, the fourth-largest school district in Illinois, just ordered $180,000 worth of wireless alarm systems for its 30 schools.
As the fall term approaches, design and construction firms, as well as manufacturers of safety products and systems, will be called upon to safeguard the nation’s schoolchildren even more vigorously than in the past.
Read BD+C's full Giants 300 Report
Related Stories
| May 7, 2014
Design competition: $900,000 on the line in Las Vegas revitalization challenge
Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.
| May 6, 2014
'Beyond' is artist's cinematic take on 2.5 years of development in the UAE
Seven-minute video offers a time-lapse trip through the built environments of Abu Dhabi and Dubai.
| May 6, 2014
'Ugliest building in New Jersey' finally getting facelift
After a decade of false starts and mishaps, the American Dream mall in the Meadowlands may finally get built.
| May 5, 2014
Toronto residential tower to feature drawer-like facade scheme
Some of the apartments in the new River City development will protrude from the building at different lengths, creating a drawer-like "push-pull" effect.
| May 5, 2014
Tragic wired glass injury makes headlines yet again
In the story, a high school student pushed open a hallway door glazed with wired glass. His arm not only broke the glass, but penetrated it, causing severe injuries. SPONSORED CONTENT
| May 3, 2014
Health system capital planning for the future: The benefits of master plan portfolio analysis and ambulatory market modeling
Money continues to be scarce, yet U.S. health systems need to invest and re-invest in their physical future. Healthcare facilities planning experts from CBRE Healthcare outline tools and strategies for identifying where to best allocate precious resources.
| May 3, 2014
4 easy steps to being a great project manager
Managing a team of people, especially creative people, is a task that not everyone is up for. Keeping your team on the same page while maintaining a schedule and budget that can keep your corporation happy will take confidence and bountiful people skills. Here are some tips for effectively managing a project. SPONSORED CONTENT
Sponsored | | May 3, 2014
Fire-rated glass floor system captures light in science and engineering infill
In implementing Northwestern University’s Engineering Life Sciences infill design, Flad Architects faced the challenge of ensuring adequate, balanced light given the adjacent, existing building wings. To allow for light penetration from the fifth floor to the ground floor, the design team desired a large, central atrium. One potential setback with drawing light through the atrium was meeting fire and life safety codes.
| May 2, 2014
World's largest outdoor chandelier tops reworked streetscape for Cleveland's PlayhouseSquare
Streetscape project includes monumental gateway portals, LED signage, and a new plaza, fire pit, sidewalk café, and alfresco dining area.