Schneider Electric has announced the availability of three new emergency lighting control solutions: the UL924 Emergency Lighting Control Relay, the UL924 Emergency Lighting Control Relay with Panel Mount, and the UL924 Emergency Lighting Dimmer Control.
These emergency control devices enable building owners, managers, contractors and builders to implement the necessary emergency lighting in their facilities to meet compliance standards while saving energy, time and resources.
Schneider Electric’s new UL924 Emergency Lighting Control products offer a versatile and energy-efficient solution that enables standard, existing fixtures to also be used for emergency lighting applications, saving the costs associated with the installation of additional emergency lighting fixtures. Also, the emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. Finally, the emergency lighting control devices save both energy and money by providing emergency backup power only when needed.
The three new models are designed to meet the different needs and requirements found within many of today’s buildings:
- UL 924 Emergency Lighting Control Relay (ERC): A low-profile device that can be mounted in the ceiling, the ERC provides emergency lighting to switched loads when a power drop is detected and automatically transfers lighting back to normal utility power once restored. An automatic diagnostic feature replaces the need for an accessible test switch.
- UL924 Emergency Lighting Control Relay with Panel Mount (EPMC): Equipped with the detecting and switching features of the ERC, this relay is a universally compatible device available in both 120V and 277V models. The EPMC includes a test switch that offers the convenience of testing an emergency lighting system with a simple push of a button. The solution is also equipped with a green LED to confirm wiring connections and power availability.
- UL924 Emergency Lighting Dimmer Control (EDC): Specifically designed with dimmable lights in mind, the EDC senses a voltage drop from a regular lighting circuit and automatically turns lights on to full brightness after transferring the load to the emergency source. The product is also available in both 120V and 277V models and is equipped with a simple test switch and a green LED to confirm wiring connections and power availability.
Related Stories
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Carvalho appointed Shawmut Safety Director
He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system.
| Feb 29, 2012
Shepley Bulfinch selected to design new Children’s Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.