Schneider Electric has announced the availability of three new emergency lighting control solutions: the UL924 Emergency Lighting Control Relay, the UL924 Emergency Lighting Control Relay with Panel Mount, and the UL924 Emergency Lighting Dimmer Control.
These emergency control devices enable building owners, managers, contractors and builders to implement the necessary emergency lighting in their facilities to meet compliance standards while saving energy, time and resources.
Schneider Electric’s new UL924 Emergency Lighting Control products offer a versatile and energy-efficient solution that enables standard, existing fixtures to also be used for emergency lighting applications, saving the costs associated with the installation of additional emergency lighting fixtures. Also, the emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. Finally, the emergency lighting control devices save both energy and money by providing emergency backup power only when needed.
The three new models are designed to meet the different needs and requirements found within many of today’s buildings:
- UL 924 Emergency Lighting Control Relay (ERC): A low-profile device that can be mounted in the ceiling, the ERC provides emergency lighting to switched loads when a power drop is detected and automatically transfers lighting back to normal utility power once restored. An automatic diagnostic feature replaces the need for an accessible test switch.
- UL924 Emergency Lighting Control Relay with Panel Mount (EPMC): Equipped with the detecting and switching features of the ERC, this relay is a universally compatible device available in both 120V and 277V models. The EPMC includes a test switch that offers the convenience of testing an emergency lighting system with a simple push of a button. The solution is also equipped with a green LED to confirm wiring connections and power availability.
- UL924 Emergency Lighting Dimmer Control (EDC): Specifically designed with dimmable lights in mind, the EDC senses a voltage drop from a regular lighting circuit and automatically turns lights on to full brightness after transferring the load to the emergency source. The product is also available in both 120V and 277V models and is equipped with a simple test switch and a green LED to confirm wiring connections and power availability.
Related Stories
| Dec 3, 2013
Creating a healthcare capital project plan: The truth behind the numbers
When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process.
| Dec 3, 2013
Architects urge government to reform design-build contracting process
Current federal contracting laws are discouraging talented architects from competing for federal contracts, depriving government and, by inference, taxpayers of the best design expertise available, according to AIA testimony presented today on Capitol Hill.
| Dec 3, 2013
Construction spending hits four-year peak after rare spike in public outlays
An unusual surge in public construction in October pushed total construction spending to its highest level since May 2009 despite a dip in both private residential and nonresidential activity.
| Nov 27, 2013
BIG's 'oil and vinegar' design wins competition for the Museum of the Human Body [slideshow]
The winning submission by Bjarke Ingels Group (BIG) and A+ Architecture mixes urban pavement and parkland in a flowing, organic plan, like oil and vinegar, explains Bjarke Ingels.
| Nov 27, 2013
Retail renaissance: What's next?
The retail construction category, long in the doldrums, is roaring back to life. Send us your comments and projects as we prepare coverage for this exciting sector.
| Nov 27, 2013
Pediatric hospitals improve care with flexible, age-sensitive design
Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 27, 2013
University reconstruction projects: The 5 keys to success
This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.
| Nov 26, 2013
7 ways to make your firm more successful
Like all professional services businesses, AEC firms are challenged to effectively manage people. And even though people can be rather unpredictable, a firm’s success doesn’t have to be. Here are seven ways to make your firm more successful in the face of market variability and uncertainty.