Schneider Electric has announced the availability of three new emergency lighting control solutions: the UL924 Emergency Lighting Control Relay, the UL924 Emergency Lighting Control Relay with Panel Mount, and the UL924 Emergency Lighting Dimmer Control.
These emergency control devices enable building owners, managers, contractors and builders to implement the necessary emergency lighting in their facilities to meet compliance standards while saving energy, time and resources.
Schneider Electric’s new UL924 Emergency Lighting Control products offer a versatile and energy-efficient solution that enables standard, existing fixtures to also be used for emergency lighting applications, saving the costs associated with the installation of additional emergency lighting fixtures. Also, the emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. Finally, the emergency lighting control devices save both energy and money by providing emergency backup power only when needed.
The three new models are designed to meet the different needs and requirements found within many of today’s buildings:
- UL 924 Emergency Lighting Control Relay (ERC): A low-profile device that can be mounted in the ceiling, the ERC provides emergency lighting to switched loads when a power drop is detected and automatically transfers lighting back to normal utility power once restored. An automatic diagnostic feature replaces the need for an accessible test switch.
- UL924 Emergency Lighting Control Relay with Panel Mount (EPMC): Equipped with the detecting and switching features of the ERC, this relay is a universally compatible device available in both 120V and 277V models. The EPMC includes a test switch that offers the convenience of testing an emergency lighting system with a simple push of a button. The solution is also equipped with a green LED to confirm wiring connections and power availability.
- UL924 Emergency Lighting Dimmer Control (EDC): Specifically designed with dimmable lights in mind, the EDC senses a voltage drop from a regular lighting circuit and automatically turns lights on to full brightness after transferring the load to the emergency source. The product is also available in both 120V and 277V models and is equipped with a simple test switch and a green LED to confirm wiring connections and power availability.
Related Stories
Multifamily Housing | Jul 12, 2017
Midyear Rent Report: 26 states saw rental price increases in first half of 2017
The most notable rental increases are in growing markets in the South and Southwest: New Orleans, Glendale, Ariz., Houston, Reno, N.V., and Atlanta.
Giants 400 | Jul 12, 2017
Innovation abounds, but will it lead to growth for AEC Giants?
Engineering firms such as Arup, Glumac, and Thornton Tomasetti are leveraging their in-house expertise to develop products and tools for their design teams, clients, and even the competition.
Multifamily Housing | Jul 12, 2017
7 noteworthy multifamily projects: posh amenities, healthy living, plugged-in lifestyle
Zen meditation gardens, bocce courts, saltwater pools, and free drinks highlight the niceties at these new multifamily developments.
Accelerate Live! | Jul 6, 2017
Watch all 20 Accelerate Live! talks on demand
BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.
Healthcare Facilities | Jun 29, 2017
Uniting healthcare and community
Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.
Architects | Jun 25, 2017
Stantec adds RNL Design to its stable, fortifying several of its business units
The engineering giant also names successor to CEO who will retire at the end of this year.
Building Team | Jun 22, 2017
Seven lessons learned on commissioning projects
Commissioning is where the rubber meets the road in terms of building design.
Sponsored | Building Team | Jun 20, 2017
Plan ahead when building in the west
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.
Architects | Jun 19, 2017
Preparing to negotiate: Get your head in the game
Logical and well-planned steps to effective negotiation.
| Jun 13, 2017
Accelerate Live! talk: Is the road to the future the path of least resistance? Sasha Reed, Bluebeam (sponsored)
Bluebeam’s Sasha Reed discusses why AEC leaders should give their teams permission to responsibly break things and create ecosystems of people, process, and technology.