flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

Mixed-Use

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.


By David Malone, Associate Editor | December 14, 2018
Monroe Blocks exterior

Courtesy Hayes Davidson

The northeast corner of Detroit’s Campus Martius Park will be home to Monroe Blocks, Schmidt hammer Lassen Architect’s first U.S. project. The project will span a 134,548-sf site across two city blocks and include the first high-rise office tower built in downtown Detroit in more than 25 years.

Monroe Blocks will include a mix of modern office space, residential units, restaurants, retail, and approximately 51,660 sf of public outdoor space. Schmidt Hammer Lassen will work with Neumann/Smith Architecture to reintroduce historic alleyways and public access points and prioritize the public realm by connecting the outdoors with each structure’s ground floor.

See Also: 62-story luxury rental tower provides 40,000 sf of indoor and outdoor amenities in Manhattan

 

Monroe Block retail spaceCourtesy Schmidt Hammer Lassen Architects.

 

The development is being built in an area that was known as Detroit’s first theater district. The National Theatre, the sole remaining building from this original theater district, will have its ornate terracotta archway incorporated into the Monroe Blocks design. It will be disassembled, catalogued, and relocated to a new pedestrian walkway that will bisect the new development.

 

Monroe Block interior office floorCourtesy Schmidt Hammer Lassen Architects.

 

A groundbreaking event recently took place on Monroe Banks Plot A, which will include a 35-storey glass and terracotta office tower, a 17-story, 148-unit residential building, and a total of 66,000 sf of retail space.

Monroe Blocks is scheduled to complete in early 2022.

 

Monroe Blocks aerial viewCourtesy Hayes Davidson.

 

Monroe Blocks courtyardCourtesy Hayes Davidson.

Tags

Related Stories

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Office Buildings | Feb 23, 2022

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.

Mixed-Use | Feb 9, 2022

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.

Mixed-Use | Jan 13, 2022

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

Mixed-Use | Jan 5, 2022

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.

Mixed-Use | Dec 21, 2021

Riverside Wharf will be Miami’s newest entertainment complex

Cube3 Architects is designing the project.

Mixed-Use | Nov 11, 2021

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.

Mixed-Use | Oct 22, 2021

40 West 12th residential tower opens in Atlanta’s Midtown neighborhood

The project is part of the 1105 West Peachtree Development.

Multifamily Housing | Oct 20, 2021

Sacramento’s first luxury high-rise rental residences announced

Southern Land Company is developing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021