flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

Mixed-Use

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.


By David Malone, Associate Editor | May 24, 2017

After closing its doors in 2008, the industrial site of the former Carlsberg Brewery production plant in Copenhagen, Denmark has re-emerged as a sustainable city district. It is home to urban spaces, public transport, and new buildings that complement the existing historical architecture.

Now, the newest planned development for the district has officially selected its architect. Schmidt Hammer Lassen Architects (along with Holscher Nordberg Architects) will develop a 387,500-sf project that consists of one city block and a 262-foot-tall residential building. The development will sit near the famous Elephant gates in the northwestern corner of the site and provide 17,000 sm of housing, 7,000 sm of offices, 2,000 sm of retail, cafes, and restaurants, and 10,000 sm of basement space. The new residential tower will form a link between the two main public squares in the Carlsberg city district.

“The location, with historic neighbors and a sloping terrain, creates an exciting and technical challenge. At the same time, the tower will rise above Carlsberg City and become part of Copenhagen's new skyline, thus becoming a reference point that both historically and physically will help tie the city together," says Senior Partner at Schmidt Hammer Lassen, Kristian Ahlmark.

The entire Carlsberg City district is expected to be completed in 2024. The development will offer over 3,000 new homes. 10,000 students have already begun their first semester at the new UCC Campus Carlsberg.  Transportation options will include a large network of bicycle paths and a new modern commuter railway station.

Related Stories

Mixed-Use | May 23, 2019

237-room hotel will anchor Nashville’s new $540 million mixed-use development

Chartwell Hospitality will operate the hotel.

Mixed-Use | May 15, 2019

Puerto Rican mixed-use, mixed income housing development begins construction

Álvarez-Díaz & Villalón designed the project.

Mixed-Use | May 14, 2019

Mixed-use community breaks ground in Greenville, S.C.

The Beach Company is developing the project.

Mixed-Use | May 9, 2019

Development builds on success of Chicago’s River North

One Chicago will further enliven upscale, artsy area.

Mixed-Use | May 3, 2019

The Colorado Rockies get into the sports-anchored development game

The project is currently under construction across the street from Coors Field.

Mixed-Use | May 2, 2019

A series of green bridges will connect these two towers in Shenzhen, China

Steven Holl Architects designed the project.

Mixed-Use | Apr 26, 2019

Miami’s 7-acre Link at Douglas breaks ground

The project will be built in phases over the next five years.

Mixed-Use | Apr 7, 2019

Chicago-area joint venture antes up $1 billion for Opportunity Zone development investment

Decennial Group says it’s looking at 250 potential projects, primarily in America’s heartland and rural areas.

Mixed-Use | Mar 11, 2019

Podcast: Sterling Bay’s Andy Gloor discusses Chicago’s grandiose Lincoln Yards Plan

Lincoln Yards is Sterling Bay’s ambitious riverfront development of formerly industrial land between Bucktown and Lincoln Park.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021