flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

Mixed-Use

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.


By David Malone, Associate Editor | May 24, 2017

After closing its doors in 2008, the industrial site of the former Carlsberg Brewery production plant in Copenhagen, Denmark has re-emerged as a sustainable city district. It is home to urban spaces, public transport, and new buildings that complement the existing historical architecture.

Now, the newest planned development for the district has officially selected its architect. Schmidt Hammer Lassen Architects (along with Holscher Nordberg Architects) will develop a 387,500-sf project that consists of one city block and a 262-foot-tall residential building. The development will sit near the famous Elephant gates in the northwestern corner of the site and provide 17,000 sm of housing, 7,000 sm of offices, 2,000 sm of retail, cafes, and restaurants, and 10,000 sm of basement space. The new residential tower will form a link between the two main public squares in the Carlsberg city district.

“The location, with historic neighbors and a sloping terrain, creates an exciting and technical challenge. At the same time, the tower will rise above Carlsberg City and become part of Copenhagen's new skyline, thus becoming a reference point that both historically and physically will help tie the city together," says Senior Partner at Schmidt Hammer Lassen, Kristian Ahlmark.

The entire Carlsberg City district is expected to be completed in 2024. The development will offer over 3,000 new homes. 10,000 students have already begun their first semester at the new UCC Campus Carlsberg.  Transportation options will include a large network of bicycle paths and a new modern commuter railway station.

Related Stories

Mixed-Use | Dec 21, 2021

Riverside Wharf will be Miami’s newest entertainment complex

Cube3 Architects is designing the project.

Mixed-Use | Nov 11, 2021

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.

Mixed-Use | Oct 22, 2021

40 West 12th residential tower opens in Atlanta’s Midtown neighborhood

The project is part of the 1105 West Peachtree Development.

Multifamily Housing | Oct 20, 2021

Sacramento’s first luxury high-rise rental residences announced

Southern Land Company is developing the project.

Mixed-Use | Oct 11, 2021

Manhattan West opens the heart of New York City’s Far West Side

The project links several New York neighborhoods.

Mixed-Use | Oct 5, 2021

Ground-up mixed-use building completes near Wrigley Field

Hirsch/MPG Architecture + Planning designed the project.

Mixed-Use | Sep 28, 2021

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021