flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.


By By BD+C Staff | December 5, 2011
Dr. Phillips charities headquarters SchenkelSchultz Architecture
Designed to provide an understated elegance symbolic of the Dr. Phillips heritage, the facility replaces the prior headquarters

SchenkelShultz Architecture designed the newly-opened Dr. Phillips Charities headquarters building, a sustainable Mediterranean-styled facility located at 7400 Dr. Phillips Boulevard in the southwest Orlando community that bears its name – Dr. Phillips, Fla.

Designed to achieve LEED Certification from the USGBC, the 20,000-sf facility houses The Dr. P. Phillips Foundation and Dr. Phillips, Inc., the two distinct funding organizations that comprise Dr. Phillips Charities.

The Dr. Phillips name has held a major economic and philanthropic presence in Central Florida since the turn of the 20th century. As stewards of the Dr. P. Phillips family holdings, Dr. Phillips Charities honors their legacy by supporting Central Florida nonprofits and charitable organizations directly impacting the lives of thousands of children and families annually.

According to J. Thomas Chandler, AIA, President and COO of SchenkelShultz, the building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices. Designed to provide an understated elegance symbolic of the Dr. Phillips heritage, the facility replaces the prior headquarters building that had been located in downtown Orlando for over 100 years.

Brasfield & Gorrie served as the general contractor for the project. BD+C

Related Stories

| Jan 3, 2012

Rental Renaissance, The Rebirth of the Apartment Market

Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.

| Dec 29, 2011

OSHA enforcing new fall hazard standards

OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.

| Dec 29, 2011

Decision not to fireproof the new World Trade Center Transportation Hub criticized

Some criticized the decision, reasoning that the structure could be a terrorist target.

| Dec 29, 2011

Seismic safety in question at thousands of California public schools

California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.

| Dec 29, 2011

GreenWizard offers cloud-based LEED credit management, assessment

The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.

| Dec 27, 2011

Clayco awarded expansion of Washington University Data Center in St. Louis

Once completed, the new building addition will double the size of the data center which houses sophisticated computer networks that store massive amounts of genomic data used to identify the genetic origins of cancer and other diseases. 

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 27, 2011

Nova completes $60M Clearwater Conference Center

Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners

| Dec 27, 2011

BD+C's Under 40 Leadership Summit update

The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021