flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sandy Hook Permanent Memorial set to break ground

Architects

Sandy Hook Permanent Memorial set to break ground

SWA Group designed the project.


By David Malone, Associate Editor | June 15, 2021
The Clearing aerial view
The Clearing aerial view

SWA Group has recently announced the approval of The Clearing, the firm’s design for the Sandy Hook Permanent Memorial. The design was selected unanimously by the Sandy Hook Permanent Memorial Commission among 189 international design submissions.

The design’s three hallmarks include "the circle," "the path," and "the tree." A circling network of paths takes visitors through a woodland and meadows. “Our path moves in gentle circles through a flowering woodland which celebrates the lives of the victims, and eventually arrives at a central memorial ‘clearing’ where the community can gather in love for those lost,” said Co-Designer Ben Waldo. “The path has no true beginning or end, which allows visitors to experience the space at their own pace and in their own way, while always bringing them closer together.”

 

The Clearing water feature by SWA Group

 

The connecting paths allow the visitor to experience the space in their own way and at their own pace before arriving at the center. The Memorial Clearing is framed by two low stone walls with wood tops and two low stone seatwalls.

A water feature sits in a grand basin at the center of the Memorial. The edge of the feature is engraved with the names of the victims. Water flows inwards toward a planter at the center, where a the “Sacred Sycamore” is planted at the center of the pool, symbolizing the growth of the community.

 

The Clearing Meadow view from the east

 

In addition to SWA Group, the build team also includes JMC (civil engineer), GNBC (structural engineer), Atelier Ten (lighting), Fluidity (water feature design), Artemis (landscape architect), and Centek Engineering (electrical engineer).

The Memorial will sit on a donated five-acre site in Newtown, Conn., with groundbreaking set to take place in August. The project is slated to be complete and open on Dec. 14, 2022, the 10th anniversary of the tragedy.

 

Overlook of the Clearing

Tags

Related Stories

| Nov 20, 2012

PC Construction completes Juniper Hall at Champlain College

Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council.

| Nov 14, 2012

U.S. Green Building Council partners with Pearson

Partnership will help further USGBC’s mission by advancing green building education

| Nov 14, 2012

U.S. Green Building Council announces grant from Google to catalyze transformation of building materials industry and indoor health

Focus is on healthy building materials to promote indoor environmental quality and human health

| Nov 14, 2012

USGBC's Greenbuild International Conference and Expo kicks off in San Francisco

7,000 members of the green building industry convene for opening plenary headlined by "Morning Joe" co-hosts Mika Brzezinksi and Joe Scarborough

| Nov 13, 2012

Have colleges + universities gone too far with "Quality of Life" buildings?

We'd like your input - recent projects, photo/s, renderings, and expert insight - on an important article we're working on for our Jan 2013 issue

| Nov 13, 2012

Turner Construction’s green building Market Barometer reveals new findings on green building and certification

Respondents indicated a widespread commitment to sustainable practices

| Nov 13, 2012

Soladigm announces new glass product, changes company name to View, Inc.

Glass is installed and operating at W San Francisco adjacent to the 2012 Greenbuild show

| Nov 13, 2012

Sto Corp. announces appointment of new CMO

Bottema will be responsible for all corporate marketing, product management and sales activities.

| Nov 13, 2012

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco

| Nov 12, 2012

PCI Skanska celebrates 40-year anniversary

Since its creation, PCI Skanska has provided EPC services to clients for more than 40 years.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021