flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Francisco’s first WELL v1 Certified project has been completed

Office Buildings

San Francisco’s first WELL v1 Certified project has been completed

The space emphasizes WELL’s vital concepts of air, water, nourishment, light, fitness, comfort, and mind within the workplace.


By David Malone, Associate Editor | December 14, 2017
The BCCI Construction Company headquarters
The BCCI Construction Company headquarters

The new build-out of the BCCI Construction Company’s headquarters in San Francisco, Calif., is the 31st WELL v1Certified project in the world, the 18th certified project in the U.S., the sixth in California, and the first in San Francisco.

The headquarters space, which was designed and constructed by BCCI Construction Company, supports project collaboration and interaction while also incorporating quiet spaces for focused work.

 

Collaboration space at BCCI

 

The new BCCI Construction Company headquarters uses materials and furnishings with low-emitting volatile organic compounds to ensure healthy air for employees. The removal of both office walls and low ceilings connects employees to the natural environment and fills the space with natural light. Other office features include sit-stand desks, ergonomic chairs, private focus rooms, phone rooms, a wellness room, a lounge area, and a patio.

 

Kitchen and meeting space at BCCI

 

A bicycle rack is available for employees who ride to work and filtered water stations encourage everyone to drink more water. Local organic fruits and vegetables are provided twice weekly to ensure nutritious foods are regularly available.

In addition to BCCI Construction Company, the Building Team also included Partner Engineering and Science as the structural engineer and Amit Wadhwa & Associates as the MEP engineer.

 

BCCI headquarters

Related Stories

| Oct 12, 2010

From ‘Plain Box’ to Community Asset

The Mid-Ohio Foodbank helps provide 55,000 meals a day to the hungry. Who would guess that it was once a nondescript mattress factory?

| Oct 11, 2010

HGA wins 25-Year Award from AIA Minnesota

HGA Architects and Engineers won a 25-Year Award from AIA Minnesota for the Willow Lake Laboratory.

| Oct 8, 2010

Union Bank’S San Diego HQ awarded LEED Gold

Union Bank’s San Diego headquarters building located at 530 B Street has been awarded LEED Gold certification from the Green Building Certification Institute under the standards established by the U.S. Green Building Council.  Gold status was awarded to six buildings across the United States in the most recent certification and Union Bank’s San Diego headquarters building is one of only two in California.

| Oct 6, 2010

Windows Keep Green Goals in View

The DOE's National Renewable Energy Laboratory has almost 600 window openings, and yet it's targeting LEED Platinum, net-zero energy use, and 50% improvement over ASHRAE 90.1. How the window ‘problem’ is part of the solution.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021