flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Francisco’s first WELL v1 Certified project has been completed

Office Buildings

San Francisco’s first WELL v1 Certified project has been completed

The space emphasizes WELL’s vital concepts of air, water, nourishment, light, fitness, comfort, and mind within the workplace.


By David Malone, Associate Editor | December 14, 2017
The BCCI Construction Company headquarters
The BCCI Construction Company headquarters

The new build-out of the BCCI Construction Company’s headquarters in San Francisco, Calif., is the 31st WELL v1Certified project in the world, the 18th certified project in the U.S., the sixth in California, and the first in San Francisco.

The headquarters space, which was designed and constructed by BCCI Construction Company, supports project collaboration and interaction while also incorporating quiet spaces for focused work.

 

Collaboration space at BCCI

 

The new BCCI Construction Company headquarters uses materials and furnishings with low-emitting volatile organic compounds to ensure healthy air for employees. The removal of both office walls and low ceilings connects employees to the natural environment and fills the space with natural light. Other office features include sit-stand desks, ergonomic chairs, private focus rooms, phone rooms, a wellness room, a lounge area, and a patio.

 

Kitchen and meeting space at BCCI

 

A bicycle rack is available for employees who ride to work and filtered water stations encourage everyone to drink more water. Local organic fruits and vegetables are provided twice weekly to ensure nutritious foods are regularly available.

In addition to BCCI Construction Company, the Building Team also included Partner Engineering and Science as the structural engineer and Amit Wadhwa & Associates as the MEP engineer.

 

BCCI headquarters

Related Stories

| Apr 18, 2014

First international buildings among 700-plus certified by BOMA 360 Performance Program

In the first quarter of 2014, the Building Owners and Managers Association (BOMA) International certified 66 properties in the BOMA 360 Performance Program for commercial real estate markets across the U.S and, for the first time, abroad.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 15, 2014

12 award-winning structural steel buildings

Zaha Hadid's Broad Art Museum and One World Trade Center are among the projects honored by the American Institute of Steel Construction for excellence in structural steel design.

| Apr 15, 2014

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

The distinctive building, with its shimmering vertical brass elements and glass façade design, beat out two other finalists in the Nobel Center architectural competition.

| Apr 11, 2014

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.

| Apr 11, 2014

First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter

Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 31, 2014

Removable flood prevention system installed in one of New York City's largest office buildings

EKO Flood Protection created a flood prevention solution for one of New York City's largest office buildings, 55 Water Street, that can be put up in 8 hours by a crew of 30 people. 

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021