flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Francisco’s first WELL v1 Certified project has been completed

Office Buildings

San Francisco’s first WELL v1 Certified project has been completed

The space emphasizes WELL’s vital concepts of air, water, nourishment, light, fitness, comfort, and mind within the workplace.


By David Malone, Associate Editor | December 14, 2017
The BCCI Construction Company headquarters
The BCCI Construction Company headquarters

The new build-out of the BCCI Construction Company’s headquarters in San Francisco, Calif., is the 31st WELL v1Certified project in the world, the 18th certified project in the U.S., the sixth in California, and the first in San Francisco.

The headquarters space, which was designed and constructed by BCCI Construction Company, supports project collaboration and interaction while also incorporating quiet spaces for focused work.

 

Collaboration space at BCCI

 

The new BCCI Construction Company headquarters uses materials and furnishings with low-emitting volatile organic compounds to ensure healthy air for employees. The removal of both office walls and low ceilings connects employees to the natural environment and fills the space with natural light. Other office features include sit-stand desks, ergonomic chairs, private focus rooms, phone rooms, a wellness room, a lounge area, and a patio.

 

Kitchen and meeting space at BCCI

 

A bicycle rack is available for employees who ride to work and filtered water stations encourage everyone to drink more water. Local organic fruits and vegetables are provided twice weekly to ensure nutritious foods are regularly available.

In addition to BCCI Construction Company, the Building Team also included Partner Engineering and Science as the structural engineer and Amit Wadhwa & Associates as the MEP engineer.

 

BCCI headquarters

Related Stories

| Nov 8, 2011

WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles

Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

| Nov 2, 2011

Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.

307,000-sf building to be house to executive offices of Biogen Idec.

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 18, 2011

Dow Building Solutions invests in two research facilities to deliver data to building and construction industry

  State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 17, 2011

Schneider Electric introduces UL924 emergency lighting control devices

The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. 

| Oct 14, 2011

AISC develops new interoperability strategy to move construction industry forward

AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021