San Francisco has released its Tall Buildings Strategy that outlines plans for better seismic resiliency for high-rise buildings.
A city building inventory shows that 156 buildings—either existing or under construction—are taller than 240 feet. One hundred of those were built prior to modern seismic code implementation.
A report by the non-profit Applied Technology Council recommends that the city develop regulations to address foundation and geotechnical issues like those plaguing Millennium Tower. That 58-story structure has started sinking and tilting.
The report suggests that city building codes be revised to mandate lower thresholds for seismic evaluations and retrofits when existing buildings undergo renovations, or when they are sold or re-leased. In addition, the report recommends that steel-frame buildings be inspected for weld damage that might have been caused by the 1989 Loma Prieta earthquake.
Related Stories
Codes and Standards | Jul 30, 2020
Institute for Market Transformation acquires Energy-Efficient Codes Coalition
Goal is to achieve net-zero construction by 2050.
Codes and Standards | Jul 29, 2020
Crackdowns grow on construction firms that fail to follow COVID-19 guidelines
States, cities, and OSHA enforce social distancing, hand-washing regulations.
Codes and Standards | Jul 28, 2020
California utility adopts climate emergency declaration
Sacramento-region company commits to working towards carbon neutrality by 2030.
Codes and Standards | Jul 27, 2020
Updated Energy Plus and OpenStudio building energy modeling tools released
Software offers performance enhancements.
Codes and Standards | Jul 23, 2020
North Carolina will stop relying on FEMA flood mapping
State will identify flood zones on its own.
Codes and Standards | Jul 22, 2020
New version of IAPMO’s Water Demand Calculator is available
Enhanced features include selection between single- and multifamily buildings.
Codes and Standards | Jul 22, 2020
Mobile app calculates sound transmission for wood-framed assemblies
American Wood Council tool for floor-ceiling assemblies.
Codes and Standards | Jul 22, 2020
Architecture billings remain in negative territory, begin to stabilize
Fewer architecture firms report declining billings this month.
Codes and Standards | Jul 20, 2020
N.Y. construction firm to pay $1.5 million to settle sexual harassment claim
Managers said to demand sex for pay and OT opportunities.
Codes and Standards | Jul 16, 2020
Tips to make optimal use of salvaged materials
Integrated teams, staging warehouse, and looking early and often, among recommendations.