flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Diego Chargers announce plan for downtown stadium and convention center

Sports and Recreational Facilities

San Diego Chargers announce plan for downtown stadium and convention center

The project will be funded primarily by a tax increase on hotel stays.


By Mike Chamernik, Associate Editor | April 1, 2016
San Diego Chargers announce plan for downtown stadium and convention center

Qualcomm Stadium, the San Diego Chargers' current home. Photo: SD Dirk/Creative Commons

The San Diego Chargers released a 110-page report regarding details of a $1.8 billion plan for a new football stadium and convention center in downtown San Diego.

The stadium and convention center will be funded by a 4% tax increase on hotel stays. The San Diego Union-Tribune reports that the proposed hotel tax rate, 16.5%, will be one of the country’s highest. 

But the rate will spare taxpayers of a large financial burden. Funding will come from the hotel tax increase and $650 million from the Chargers and the NFL.

The Chargers will sign a 30-year lease and a non-relocation agreement, and they will be responsible for any construction cost overruns and future stadium improvements.

The new report is the first step toward gaining 70,000 signatures by June so that the plan can be included on California ballots this November. 

A final architectural plan has not been determined. Options include building the convention center either underneath or next to the stadium. Dubbed the "convadium," it will be built near Petco Park, where the San Diego Padres of MLB play.

Qualcomm Stadium, the Chargers' current 70,000-seat home, was built in 1967 and is the NFL’s fifth-oldest stadium. The team desires a new home, either in San Diego or elsewhere.

Los Angeles has been a possibility for the last several years. This winter, the NFL approved the St. Louis Rams’ proposal for a new $3 billion stadium in Inglewood (just outside of L.A.), and the league rejected a joint stadium venture in the city for the Chargers and Oakland Raiders. The Chargers have a year to decide whether they want to move to Los Angeles and share a stadium with the Rams.

Related Stories

| Apr 11, 2014

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.

| Apr 10, 2014

Collegiate sports becoming greener: Survey

A survey conducted from May through June 2013 by the University of Arizona Office of Sustainability and published by the Natural Resources Defense Council (NRDC)* finds that more collegiate athletic teams are adopting green and sustainable practices in operation of their sports facilities.

| Apr 9, 2014

Colossal aquarium in China sets five Guinness World Records

With its seven salt and fresh water aquariums, totaling 12.87 million gallons, the Chimelong Ocean Kingdom theme park is considered the world’s largest aquarium.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021