flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Antonio’s electric utility HQ to transform into a modern office building

Office Buildings

San Antonio’s electric utility HQ to transform into a modern office building

The $10 million renovation will create 100,000 square feet of office and retail space with views of the city’s famed River Walk.


By Novid Parsi, Contributing Editor | June 13, 2022
146 Navarro ext 1
Courtesy Gensler.

In San Antonio, Tex., the former headquarters of CPS Energy, the city’s electric utility, is slated to transform into 100,000 square feet of office and retail space on San Antonio’s famed River Walk. BH Properties recently released its $10 million renovation plan for 146 Navarro.

Constructed in 1987, 146 Navarro has not been updated in decades. With the renovation project, each of the building’s three 28,000-square-foot cantilevered floors of office space will undergo a complete transformation to meet the modern needs of multiple tenants. The design, created by Gensler, takes advantage of the nine-foot floor heights, 1,500-square-foot wraparound patios, and floor-to-ceiling windows offering unobstructed views of the River Walk and downtown San Antonio.  

Each of the three office levels will have large, open floorplates with private, stepped-back terraces overlooking the river. The office component will sit on top of the once-private seven-story garage, which will be opened to the public to provide more than 600 parking spaces. 

BH Properties will introduce about 20,000 square feet of street-level retail, including a two-story restaurant with views of the river. In addition to the restaurant and bar, the ground floor will be further activated with covered terraces connecting to the River Walk. An enhanced lobby will feature an extruded glass box and metal panels. And BH will create several individual 750- to 1,500-square-foot retail pods on a new pocket park plaza.

The design also will include spaces for murals. Concepts will be sourced through a public art competition organized with Centro San Antonio, a placemaking organization focused on downtown San Antonio.

 

Building Team:

Owner and developer: BH Properties

Design architect: Gensler

MEP engineer: Alderson & Associates, Inc.

Structural engineer: Architectural Engineers Collaborative

Landscaping: MP Studio

General contractor/construction manager: Skanska

146 Navarro ext 2
Courtesy Gensler.
146 Navarro ext 3
Courtesy Gensler.

 

Related Stories

High-rise Construction | Oct 5, 2016

Plans for Hudson Yards skyscraper from Bjarke Ingels have officially been filed

The 65-story tower will be primarily office space and has an estimated development cost of $3.2 billion

Office Buildings | Sep 30, 2016

How to choose the right amenities for your office

No matter how lavish the amenities, they’ll prove ineffective in making any kind of positive impact if they don’t align to a company’s culture and the characteristics that make an organization unique, write Gensler’s Lena Kitson and Kimberly Foster.

High-rise Construction | Sep 23, 2016

A massive redevelopment in Tokyo reunites developer and architect

Mitsui Fudosan and SOM join forces to create OH-1, a mixed-use complex with a prominent public square.

Office Buildings | Sep 22, 2016

‘Floating’ triangular glass building from Foster + Partners breaks ground in Copenhagen

The glass building provides the illusion of floating above a stone plinth.

Office Buildings | Sep 20, 2016

Sterling Bay proposes SOM-designed office tower near Chicago’s newly opened Transit Center at Union Station

The building is one of several projects that are filling this developer’s plate in this city.

Office Buildings | Sep 8, 2016

Taipei’s Lè Architecture, designed by Aedas, is almost complete

The 18-story building is designed to resemble a moss-covered river pebble in Taipei’s Nangang District.

Office Buildings | Sep 2, 2016

Eight-story digital installation added as part of ESI Design’s renovation of Denver’s Wells Fargo Center

The crown jewel of a three-year makeover project, the LED columns bring the building’s lobby to life.

Codes and Standards | Sep 1, 2016

Overuse of air conditioning hurts office productivity

A study found temperatures in the low 70s reduce worker performance.

| Aug 12, 2016

OFFICE GIANTS: Technology is giving office workers the chance to play musical chairs

Technology is redefining how offices function and is particularly salient in the growing trend of "hoteling" and "hot seating" or "free addressing."

boombox1
boombox2
native1

More In Category

Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021