flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

San Antonio’s electric utility HQ to transform into a modern office building

Office Buildings

San Antonio’s electric utility HQ to transform into a modern office building

The $10 million renovation will create 100,000 square feet of office and retail space with views of the city’s famed River Walk.


By Novid Parsi, Contributing Editor | June 13, 2022
146 Navarro ext 1
Courtesy Gensler.

In San Antonio, Tex., the former headquarters of CPS Energy, the city’s electric utility, is slated to transform into 100,000 square feet of office and retail space on San Antonio’s famed River Walk. BH Properties recently released its $10 million renovation plan for 146 Navarro.

Constructed in 1987, 146 Navarro has not been updated in decades. With the renovation project, each of the building’s three 28,000-square-foot cantilevered floors of office space will undergo a complete transformation to meet the modern needs of multiple tenants. The design, created by Gensler, takes advantage of the nine-foot floor heights, 1,500-square-foot wraparound patios, and floor-to-ceiling windows offering unobstructed views of the River Walk and downtown San Antonio.  

Each of the three office levels will have large, open floorplates with private, stepped-back terraces overlooking the river. The office component will sit on top of the once-private seven-story garage, which will be opened to the public to provide more than 600 parking spaces. 

BH Properties will introduce about 20,000 square feet of street-level retail, including a two-story restaurant with views of the river. In addition to the restaurant and bar, the ground floor will be further activated with covered terraces connecting to the River Walk. An enhanced lobby will feature an extruded glass box and metal panels. And BH will create several individual 750- to 1,500-square-foot retail pods on a new pocket park plaza.

The design also will include spaces for murals. Concepts will be sourced through a public art competition organized with Centro San Antonio, a placemaking organization focused on downtown San Antonio.

 

Building Team:

Owner and developer: BH Properties

Design architect: Gensler

MEP engineer: Alderson & Associates, Inc.

Structural engineer: Architectural Engineers Collaborative

Landscaping: MP Studio

General contractor/construction manager: Skanska

146 Navarro ext 2
Courtesy Gensler.
146 Navarro ext 3
Courtesy Gensler.

 

Related Stories

Office Buildings | Feb 13, 2018

Office market vacancy rate at 10-year low

Cautious development and healthy absorption across major markets contributed to the decline in vacancy, according to a new Transwestern report.

Office Buildings | Feb 8, 2018

Custom home or corporate office? Investment firm wanted both

Designed by Vertical Arts Architecture, the building features design elements found in high-end custom homes in the region.

Office Buildings | Feb 8, 2018

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Green | Jan 30, 2018

Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public

The Spheres provide the most unique aspect of Amazon’s downtown Seattle headquarters.

Office Buildings | Jan 18, 2018

At the ready: spec suites make hard-to-rent office space more attractive

Filling a need for startups looking for quick move-ins.

Office Buildings | Jan 18, 2018

*UPDATED* Amazon narrows list of possible HQ2 locations down to 20 cities

The company expects to invest over $5 billion in construction and grow HQ2 to include as many as 50,000 jobs.

Office Buildings | Jan 3, 2018

Activating the workplace

Here's how active work stations impact how you think, perform, and feel.

Office Buildings | Dec 19, 2017

How do we measure human performance, and what does it mean for the workplace?

There are many new tools and methods that are beginning to look more comprehensively to evaluate organizational well-being.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021