As modern agricultural equipment continues to get larger and more sophisticated, the buildings that sell and service those massive earthmovers must do the same.
That’s why High Plains Equipment, an independent Case IH dealership in Devils Lake, N.D., decided to replace its existing cramped quarters with a spacious, state-of-the-art metal building.
“We needed to do this for our customers. It’s as simple as that,” says John Swenseth, the company’s owner/operator.
The new space—a 38,117-sf facility with a 7,950-sf second-level mezzanine—is three times the size of the former building, improving the dealership’s ability to serve its growing customer base.
Situated on a 22-acre site along U.S. Highway 2, the new building replaces the dealership’s existing 12,000-sf building located on a much less visible site.
“Now we get people stopping in here who didn’t even realize there was a Case IH dealer in town,” Swenseth says.
The project’s three buildings include a symmetrically gabled structure and two lean-to buildings, each braced by the gabled structure.
The facility’s large clear span enabled the installation of a dozen 25-foot service bays, twice as many and twice as large as in the previous facility.
The main structure also houses two 5-ton bridge cranes, each extending 175 feet and spanning 35 feet.
“The overhead cranes are making life easier and less strenuous for our technicians,” Swenseth says. “With more shop space, we’re able to hire more technicians and they can work inside instead of outside in the mud.”
Because technicians now have the space to work on more than one job at a time, productivity has been boosted. And the facility’s three overhead doors and dedicated wash bay contribute to improved operational efficiency.
“This is a very nice technical shop,” says Mike Dunn, business development manager of Construction Engineers Ltd., the Star builder in Grand Fork, N.D. “It includes floor heat and an air-conditioning system to keep the technicians comfortable year-round.”
The new facility also includes an expanded merchandise and display area as well as an indoor expo room and kitchen for hosting customer training clinics and community events.
“It’s a good experience for customers when they come in,” Swenseth says. “It’s big and open and clean and modern. They appreciate that.”
A fast-track, design-build construction schedule enabled the building team to complete the project in about eight months.
“We assembled a lot of the frames and the roof structure on the ground, and brought a crane onsite to lift larger portions of it into place to save time and increase safety on the project,” Dunn says. “We were able to take advantage of the short building season and meet the owner’s timeline to complete the building in time for the spring selling and service season.”
Related Stories
Office Buildings | Jun 28, 2023
When office-to-residential conversion works
The cost and design challenges involved with office-to-residential conversions can be daunting; designers need to devise creative uses to fully utilize the space.
Architects | Jun 28, 2023
CSHQA hires first CEO in company's 134-year history
The Board of Directors of CSHQA announced the appointment of Ryan D. Martin, AIA NCARB as Chief Executive Officer.
Multifamily Housing | Jun 28, 2023
Sutton Tower, an 80-story multifamily development, completes construction in Manhattan’s Midtown East
In Manhattan’s Midtown East, the construction of Sutton Tower, an 80-story residential building, has been completed. Located in the Sutton Place neighborhood, the tower offers 120 for-sale residences, with the first move-ins scheduled for this summer. The project was designed by Thomas Juul-Hansen and developed by Gamma Real Estate and JVP Management. Lendlease, the general contractor, started construction in 2018.
Architects | Jun 27, 2023
Why architects need to think like developers, with JZA Architecture's Jeff Zbikowski
Jeff Zbikowski, Principal and Founder of Los Angeles-based JZA Architecture, discusses the benefits of having a developer’s mindset when working with clients, and why architecture firms lose out when they don’t have a thorough understanding of real estate regulations and challenges.
Apartments | Jun 27, 2023
Average U.S. apartment rent reached all-time high in May, at $1,716
Multifamily rents continued to increase through the first half of 2023, despite challenges for the sector and continuing economic uncertainty. But job growth has remained robust and new households keep forming, creating apartment demand and ongoing rent growth. The average U.S. apartment rent reached an all-time high of $1,716 in May.
Apartments | Jun 27, 2023
Dallas high-rise multifamily tower is first in state to receive WELL Gold certification
HALL Arts Residences, 28-story luxury residential high-rise in the Dallas Arts District, recently became the first high-rise multifamily tower in Texas to receive WELL Gold Certification, a designation issued by the International WELL Building Institute. The HKS-designed condominium tower was designed with numerous wellness details.
University Buildings | Jun 26, 2023
Addition by subtraction: The value of open space on higher education campuses
Creating a meaningful academic and student life experience on university and college campuses does not always mean adding a new building. A new or resurrected campus quad, recreational fields, gardens, and other greenspaces can tie a campus together, writes Sean Rosebrugh, AIA, LEED AP, HMC Architects' Higher Education Practice Leader.
Standards | Jun 26, 2023
New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings
The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.
Green | Jun 26, 2023
Federal government will spend $30 million on novel green building technologies
The U.S. General Services Administration (GSA), and the U.S. Department of Energy (DOE) will invest $30 million from the Inflation Reduction Act to increase the sustainability of federal buildings by testing novel technologies. The vehicle for that effort, the Green Proving Ground (GPG) program, will invest in American-made technologies to help increase federal electric vehicle supply equipment, protect air quality, reduce climate pollution, and enhance building performance.
Office Buildings | Jun 26, 2023
Electric vehicle chargers are top priority for corporate office renters
Businesses that rent office space view electric vehicle (EV) charging stations as a top priority. More than 40% of companies in the Americas and EMEA (Europe, the Middle East and Africa) are looking to include EV charging stations in future leases, according to JLL’s 2023 Responsible Real Estate study.