High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.


By Star Building Systems This is sponsored content | March 26, 2014
High Plains Equipment sells and services Case IH agricultural equipment at its n
High Plains Equipment sells and services Case IH agricultural equipment at its new 38,117 square-foot metal building in Devils L

As modern agricultural equipment continues to get larger and more sophisticated, the buildings that sell and service those massive earthmovers must do the same. 

That’s why High Plains Equipment, an independent Case IH dealership in Devils Lake, N.D., decided to replace its existing cramped quarters with a spacious, state-of-the-art metal building. 

“We needed to do this for our customers. It’s as simple as that,” says John Swenseth, the company’s owner/operator.

The new space—a 38,117-sf facility with a 7,950-sf second-level mezzanine—is three times the size of the former building, improving the dealership’s ability to serve its growing customer base. 

Situated on a 22-acre site along U.S. Highway 2, the new building replaces the dealership’s existing 12,000-sf building located on a much less visible site. 

 

 

“Now we get people stopping in here who didn’t even realize there was a Case IH dealer in town,” Swenseth says.

The project’s three buildings include a symmetrically gabled structure and two lean-to buildings, each braced by the gabled structure. 

The facility’s large clear span enabled the installation of a dozen 25-foot service bays, twice as many and twice as large as in the previous facility. 

The main structure also houses two 5-ton bridge cranes, each extending 175 feet and spanning 35 feet.

“The overhead cranes are making life easier and less strenuous for our technicians,” Swenseth says. “With more shop space, we’re able to hire more technicians and they can work inside instead of outside in the mud.”

 

 

Because technicians now have the space to work on more than one job at a time, productivity has been boosted. And the facility’s three overhead doors and dedicated wash bay contribute to improved operational efficiency.

“This is a very nice technical shop,” says Mike Dunn, business development manager of Construction Engineers Ltd., the Star builder in Grand Fork, N.D. “It includes floor heat and an air-conditioning system to keep the technicians comfortable year-round.”

The new facility also includes an expanded merchandise and display area as well as an indoor expo room and kitchen for hosting customer training clinics and community events.

“It’s a good experience for customers when they come in,” Swenseth says. “It’s big and open and clean and modern. They appreciate that.” 

A fast-track, design-build construction schedule enabled the building team to complete the project in about eight months.

“We assembled a lot of the frames and the roof structure on the ground, and brought a crane onsite to lift larger portions of it into place to save time and increase safety on the project,” Dunn says. “We were able to take advantage of the short building season and meet the owner’s timeline to complete the building in time for the spring selling and service season.” 

Owner: John Swenseth
Star Builder: Construction Engineers LTD
Architect: Icon Architectural Group, Grand Forks, ND
General Contractor: Construction Engineers LTD
Erector: Construction Engineers LTD
Joist and Deck: New Millennium Building Systems
Insulation System: Guardian Building Products
 
 

Related Stories

| Jan 2, 2013

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.

| Jan 2, 2013

Global data center market to ‘slow’ to 14.3% this year

Total global investment in data centers is expected to slow down somewhat this year but still increase at a respectable 14.3%, according to DCD Intelligence.

| Jan 2, 2013

Construction jobs made gains in 2012, even with a slow Q4, says Gilbane report

The construction sector in the nine states with 50% of construction employment was up 169,000 jobs from February to September 2012, following a lost of 137,000 jobs from September 2011 to January 2012.

| Dec 21, 2012

ABI gains for fourth straight month

Positive business conditions for all building sectors.

| Dec 17, 2012

CSM Group names recipient of the CSM Architect Fellowship Grant

With the money from the grant, Harlow has chosen to use it entirely for the Chapter of American Institute of Architecture Student’s Freedom by Design Program at Andrews University.

| Dec 9, 2012

AIA: Laboratory design, building for breakthrough science

To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021