flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

Intelligent, 3D models can be downloaded from www.safti.com and Autodesk Seek


May 6, 2013

SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.  These data-rich, intelligent 3-D models comply with the Revit Model Content Style Guide (RMCSG) version 2.1.

“We’re finding that more and more architects are adopting BIM (Building Information Modeling) in their design and specification process,” says Diana San Diego, Director of Marketing for SAFTI FIRST.  “By providing compliant Revit® models on our fire rated glass and framing assemblies, we are able to meet their needs in more efficient and effective manner.”

For more information, visit www.safti.com or call 888.653.3333.

About SAFTI FIRST
Founded in 1981, SAFTI FIRST Fire Rated Glazing Solutions (www.safti.com) has been serving the architectural and building communities and is the recognized leader in manufacturing fire rated glass and framing for over 30 years.  As the premier source for fire-rated glazing, SAFTI FIRST was the first to introduce transparent fire rated walls to the U.S. market. Our SuperLite™ product line, fire rated from 20 minutes to three hours, includes fire-retardant filled glass units, safety ceramics, safety wired glass and SuperLite I-XL, a patented breakthrough fire protective  product that significantly reduces radiant heat transfer (does not meet ASTM E119 and requires AHJ approval for 45 and 60 minute applications).  SuperLite™ products can protect against noise, attack, impact, bullets, blast, hurricane and UV rays and is available in any custom architectural make-up, including enhanced energy performance applications.  SAFTIfire GPX Framing is fire rated from 20 minutes to 2 hours.  Our products are manufactured in the U.S. for fast lead times.  For more information, call 888.653.3333.

Autodesk , Autodesk (logo),and Revit are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries.

Related Stories

| May 23, 2013

Supertall 'Sky City' will house 4,400 families in Changsha, China

Broad Sustainable Building has completed a long and arduous approval process, and is starting excavation and construction on Sky City in June, 2013. The proposed "world's tallest building" will be a mixed-use project that could accommodate life and work needs of up to 30,000 people.

| May 23, 2013

Are design-build contracts killing small architecture firms?

Are federal design-build contract laws unfair to small firms? AIA thinks so, citing an interesting fact: an architecture firm spends a median of $260,000 to compete for a design-build project.

| May 23, 2013

Is the 'bring your own device' discussion stumping your IT group?

A new twist to the communication challenge most companies and IT departments face is the “bring your own device,” or BYOD, conundrum. I call it a conundrum because it is stumping many IT professionals.

| May 23, 2013

Portland State University’s School of Architecture launches Center for Public Interest Design

Portland State University’s School of Architecture is proud to announce the launch of its new Center for Public Interest Design, a research center that aims to investigate and utilize the power of design to make social, economic and environmental change in disadvantaged communities worldwide. The Center is the first of its kind in the nation.

| May 22, 2013

Return of retail? Rent growth seen in recovering markets

Like digging a ditch with a spoon, retail demand driven by population growth has eaten away at the supply of available store space in the markets that have been slowest to recover from the downturn. Vacancy rates are reaching a point that will give at least some landlords in every market the clout to demand slightly higher rents.

| May 22, 2013

New ASTM standard enhances hollow structural sections

ASTM A1085 is a big step forward in simplifying HSS design and usage, thereby making it a more desirable option for HSS.

| May 22, 2013

Architecture billings take a step back in April, ending growth streak

For the first time in 10 months, the AIA's Architecture Billings Index slipped into negative territory, falling to 48.6 in April, down from 51.9 the previous month. This is the ABI's lowest mark since July 2012.

| May 21, 2013

Foster + Partners reveals plans for London residential towers

  British firm Foster + Partners has unveiled plans for two residential skyscrapers as part of a mixed-use development in north London.

| May 21, 2013

RSMeans cost comparisons: pools, racquetball courts, bowling alleys, hockey/soccer facilities

Construction market analysts from RSMeans offer construction costs per square foot for four building types across 25 metro markets.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021