After a massive five-alarm fire destroyed a partially constructed five-story, 241-unit, $51 million apartment building in Raleigh, the safety of wood-frame construction came under scrutiny.
The blaze also caused minor damage of a neighboring wood-framed, multi-family building and forced the evacuation of its residents. The Raleigh News & Observer subsequently published an extensive report on the pros and cons of wood-framed structures, interviewing professionals in the design and construction industry and developers.
The building, a pedestal structure with a poured-concrete first level and four stories of wood-frame construction above, was about 40% complete—making it vulnerable to fire. The president of Raleigh’s firefighter union told the newspaper that wood-frame buildings are safe once finished and after sprinklers installed. Before then, the structures are like a four-story lumber yard, the firefighter told the News & Observer.
North Carolina adopted a change to the national building code in 2009 that increased the number of wood-frame stories that can be built on a pedestal or slab from four to five.
Related Stories
| May 15, 2012
Suffolk selected for Rosenwald Elementary modernization project
The 314-student station elementary school will undergo extensive modernization.
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Resilience should be considered a sustainability factor
Since a sustainable building is one you don't have to rebuild, some building sustainability experts believe adding points for "resilience" to storms and earthquakes to the LEED sustainability rating tool makes sense.
| May 10, 2012
University of Michigan research project pushes envelope on green design
A research project underway at the University of Michigan will test the potential of intelligent building envelopes that are capable of monitoring weather, daylight, and occupant use to manage heating, cooling, and lighting.
| May 10, 2012
Fire suppression agents go greener
Environmental sensitivity is helping to drive adoption of new fire suppression agents.
| May 10, 2012
Industry groups urge Congress to leave contracting decisions to agencies
An organization of several industry groups urged Congress to leave many contracting decisions to the discretion of individual agencies by avoiding blanket mandates.
| May 10, 2012
OSHA proposes new rule to have employers find and fix hazards
The Occupational Safety and Health Administration has proposed a new regulation, Injury and Illness Prevention Program, or I2P2, which would compel employers to find and fix safety hazards.
| May 3, 2012
Stay current on green codes at AGC Environmental Conference
Keep abreast of market trends such as 2012 changes to green standards and codes at the AGC Contractors Environmental Conference, June 7-8, 2012 in Arlington, Va.