After a massive five-alarm fire destroyed a partially constructed five-story, 241-unit, $51 million apartment building in Raleigh, the safety of wood-frame construction came under scrutiny.
The blaze also caused minor damage of a neighboring wood-framed, multi-family building and forced the evacuation of its residents. The Raleigh News & Observer subsequently published an extensive report on the pros and cons of wood-framed structures, interviewing professionals in the design and construction industry and developers.
The building, a pedestal structure with a poured-concrete first level and four stories of wood-frame construction above, was about 40% complete—making it vulnerable to fire. The president of Raleigh’s firefighter union told the newspaper that wood-frame buildings are safe once finished and after sprinklers installed. Before then, the structures are like a four-story lumber yard, the firefighter told the News & Observer.
North Carolina adopted a change to the national building code in 2009 that increased the number of wood-frame stories that can be built on a pedestal or slab from four to five.
Related Stories
Codes and Standards | Jun 19, 2018
Structural engineered wood products exempt from new EPA formaldehyde ruling
Exempt products include structural plywood, oriented strand board (OSB).
Codes and Standards | Jun 18, 2018
Seattle City Council repeals controversial new per-worker tax on large employers
Measure was aimed at raising $50 million for homeless services, affordable housing.
Codes and Standards | Jun 14, 2018
Hardscape from development makes ‘1,000-year’ flood in Maryland worse
Impermeable concrete made it easier for water to overwhelm drainage system.
Codes and Standards | Jun 13, 2018
United States Resiliency Council announces support for Calif. earthquake resiliency bill
Measure would help cities identify structures that could fail in major quake.
Codes and Standards | Jun 12, 2018
Congestion pricing for cars is effective in reducing traffic, but a difficult sell
After three years, traffic congestion declined by 30% in London.
Codes and Standards | Jun 11, 2018
First RFP requiring modular construction on New York City housing project issued
Part of Housing 2.0 modular construction initiative.
Codes and Standards | Jun 6, 2018
Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract
LPCiminelli stops functioning as GC in fallout from the case.
Codes and Standards | Jun 6, 2018
LEED should be updated to combat climate change
Hasn’t kept pace with urgency of problem, says clean energy investor.
Codes and Standards | Jun 5, 2018
Sports stadiums and arenas showcase sustainability features
Green venues save owners money, gain positive publicity.
Codes and Standards | Jun 4, 2018
L.A. must transition to cleaner energy, boost transit to reach sustainability goals
City aims to reduce GHGs 60% by 2035 and 80% by 2050.