flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Safdie Architects unveils design for ORCA Toronto

Mixed-Use

Safdie Architects unveils design for ORCA Toronto

The project comprises nine towers in total.


By David Malone, Associate Editor | June 10, 2021
ORCA Toronto development

Renderings courtesy Safdie Architects

Safdie Architects has shared its design for ORCA Toronto, a proposed mixed-use development in Downtown Toronto that weaves together the surrounding neighborhoods with a new 10.5-acre park.

By decking over the 100-meter-wide, 800-meter-long rail corridor leading to Union Station, the project looks to reclaim a 16.5-acre site just west of CN Tower. Of the 16.5 acres, 10.5 acres are available for an urban park with six acres that feature residential, office, hotel, retail, and transit facilities.

Safdie’s design features a configuration of slender residential towers connected by elevated bridges that accommodate housing units, gardens, and recreational facilities. Pedestrian bridges will connect the towers and create special public and community amenities. The shared indoor and outdoor amenities will exist at multiple levels and encourage interaction among residents, fostering a sense of community.

 

ORCA Toronto aerial view

 

The design will also activate 65% of the site’s area through a multilevel park. The park, designed in collaboration with PWP Landscape Architecture, will feature open lawns, playgrounds, walking trails, and bike baths that are accessible by ramps, escalators, and elevators interwoven throughout the development.

Shops, restaurants, and cafes will be directly connected with the park’s outdoor areas on several levels. The retail galleria seamlessly integrates with the park and is designed to be opened to the park in good weather and enclosed during the winter months. Direct access for pedestrians and bicyclists will be provided on all North-South cross streets to allow free movement from the surrounding streets to the park without requiring entrance through the retail galleria.

 

ORCA Toronto view from the park

 

The project incorporates nine towers in total, including a corner office tower and eight residential towers that will provide approximately 3,000 housing units.

Safdie Architects developed the project in collaboration with Arup Engineering.

Tags

Related Stories

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Mixed-Use | Feb 21, 2020

SB Architects to design Fort Lauderdale’s FATVillage mixed-use destination

The project will build upon the existing FATVillage Arts District.

Mixed-Use | Feb 14, 2020

Kenya’s Pinnacle Tower will be the tallest tower in Africa

ArchGroup Consultants is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021