flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sacramento’s first luxury high-rise rental residences announced

Multifamily Housing

Sacramento’s first luxury high-rise rental residences announced

Southern Land Company is developing the project.


By David Malone, Managing Editor | October 20, 2021
Sacramento

Courtesy Pexels

Southern Land Company (SLC) and the Sacramento Kings have announced plans for a new mixed-use, luxury high-rise project located at Capitol Mall and 3rd Street in Sacramento. The project will represent the first high-rise rental residences in Sacramento.

The mixed-use project will feature approximately 28 floors comprising 225 luxury apartment homes and an 80,000-sf mass timber office building in a prime location just 0.2 miles from Golden 1 Center, home of the Sacramento Kings. The development will offer a unique live-work-play lifestyle to its residents.

Future residents will live close to myriad shopping and dining options as well as three million sf of office space. Residents will also enjoy direct access to Crocker Park located just across the street as well as Crocker Art Museum, one of the largest art museums in North America.

After acquiring the land, known as Lot X, from the City of Sacramento, the Kings began looking for a partner to bring the new project to life, finding that partner in SLC. SLC then bought the 2.56-acre site from the Sacramento Kings. The lot has long been used as a surface parking lot for people working in nearby offices.

Renderings of the project and more details about the project’s design and features will be available at a later date.

Tags

Related Stories

Codes and Standards | Oct 17, 2022

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

Multifamily Housing | Oct 7, 2022

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

Multifamily Housing | Sep 15, 2022

Toronto’s B-Line Condominiums completed using prefabricated panels

B-Line Condos, Toronto, completed using Sto Panel Technology.

Multifamily Housing | Sep 15, 2022

Heat Pumps in Multifamily Projects

RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021