flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sacramento moves forward on multifamily project with new modular supplier

Multifamily Housing

Sacramento moves forward on multifamily project with new modular supplier

Guerdon Modular Buildings will provide modules for 118 apartments.


By John Caulfield, Senior Editor | June 1, 2015
Sacramento moves forward on multifamily project with new modular supplier

Guerdon Modular Buildings is taking over the Eviva Downtown multifamily project. Rendering courtesy Guerdon Modular Buildings.

This month, Guerdon Modular Buildings, a leading manufacturer of modular housing for the western U.S. and Canada, will start factory construction of modules for Eviva Midtown, a six-story apartment building in downtown Sacramento, Calif., that will have 118 condominium-style one- and two -bedroom rental units, ranging from 700 to 1,200 sf.

Guerdon took over as the module supplier for this project when its developer, Integral Development, decided to switch manufacturers once the previous modular subcontractor encountered planning and scheduling problems soon after the project’s groundbreaking in September 2014.

Eviva Downtown, which was once called The Warren, had been in development for nearly a decade before that groundbreaking. “Eviva is a chance for our deep bench of design, engineering, and construction professionals to demonstrate how our modular construction technology dramatically speeds the build process over traditional on-site approaches without any sacrifice to design or aesthetics,” says Curtis Fletcher, Guerdon’s business development manager. 

This building, Sacramento’s largest modular project to date, was initiated by the Capital Area Development Authority (CADA). Integral developed this project in partnership with Sacramento-based investment firm LDK Ventures. Tricorp Hearn Construction is the GC.

During the delay caused by the modular musical chairs, Integral and CADA revisited their plans for this project and made a number of modifications and structural changes to its design. To make it more distinct from neighboring buildings, they widened Eviva’s balconies, made its corners slightly taller than the rest of the project, and added a broader color palette. 

The building team chose Guerdon because its reputation for handling large-scale projects and completing modules on time. 

“Guerdon has integrated so closely with our staff that every aspect of the construction process has been worry-free, from the design and build to mapping out the delivery and installation,” says Dave Bruss, chief operations officer at Tricorp Hearn, which is based in Sacramento. On-site module installation is scheduled to begin in August. 

Located on the corner of 16th and N Streets, Eviva is part of an ongoing revival of Sacramento’s downtown area. For example, the $31 million renovation and restoration of the city’s 89-year-old, 68,000-sf Sacramento Valley Station—the busiest Amtrak depot west of Chicago—is one of the centerpieces of a large downtown redevelopment, which includes a Sacramento Entertainment and Sports Complex accompanied by a 16-story mixed-use hotel, retail, and residential complex designed by Los Angeles-based Rios Clementi Hale Studios. AECOM is the lead architect for the arena, which is scheduled to open October 2016, according to The Architects Newspaper.

Related Stories

Multifamily Housing | Aug 23, 2020

Designing affordable housing on odd urban lots in LA

"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

Multifamily Housing | Jul 29, 2020

San Francisco’s Millennium Tower fix approved, moving forward

Simpson Gumpertz & Heger will be the engineer-of-record for the fix.

Multifamily Housing | Jul 27, 2020

Putting 'home' at the heart of affordable housing

Home is a powerful thing. It’s the place that forms you, a guiding set of relationships, memories, and experiences that, for better or worse, make you who you are.

Multifamily Housing | Jul 20, 2020

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021