Rudolph and Sletten, Inc. has been recognized by the Construction Management Association of America (CMAA), San Diego Chapter for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.
The Project Achievement Award, which recognizes outstanding achievement in construction management, is presented to Rudolph and Sletten in the category of Building Renovations Greater than $10 Million.
The 84,000-sf two facility project was completed by Rudolph and Sletten January 2012. The Griffin Student Center included a 27,000-sf renovation of the existing building as well as a 20,000-sf expansion. The new center features student meeting rooms, food stations, a health services department and a 10-foot movie screen in the lobby. The Student Administrative Building was an existing 21,000-sf wood framed structure that was expanded to 38,000-square-feet. The expansion includes enclosing the interior courtyard, breezeway areas and converting into interior space. These buildings comprise the first LEED-certified project in the Grossmont-Cuyumaca Community College District. BD+C
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.