flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rooftop wind turbines becoming green status symbol in New York City

Rooftop wind turbines becoming green status symbol in New York City

Helix-shaped turbines appearing on luxury apartment buildings


By BD+C Staff | May 28, 2014
Photo: Branko Radovanovi? via Wikimedia Commons
Photo: Branko Radovanovi? via Wikimedia Commons

New York City developers are using rooftop wind turbines in an effort to attract buyers by highlighting a building’s green credentials.

A recent example is Pearson Court Square, a 197-unit apartment building in Queens which is adorned with three turbines resembling “huge carbon-fiber strands of DNA strung around a 10-foot mast,” according to the New York Times.

“We anticipated a lot of our tenants would be drawn to something different,” Ron Moelis, principal of L&M Development, the developer of Pearson Court Square, told the Times. The developer has been using sustainable design elements such as solar panels, insulated glass, and super-efficient boilers for many years. This was the developer’s first use of wind turbines.

While conventional turbines require a steady breeze of 10 miles per hour or more, helix-shaped turbines can capture winds from any direction and at lower speeds. The New York State Energy Research and Development Authority helped pay about half the $100,000 installation cost and will study the turbines’ efficacy.

Some green advocates bemoan this use of funds, however.

“A tiny windmill on a big building is just silly — it might as well be a pinwheel,” said Russell Unger, executive director of the Urban Green Council. “It’s a lovely idea, if people want to pay for it and test it out, but as far as return on investment goes, it’s a waste compared to more insulation and efficient building systems.”

(http://www.nytimes.com/2014/05/27/nyregion/turbines-pop-up-on-new-york-roofs-along-with-questions-of-efficiency.html?_r=0)

Related Stories

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021