flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

RJM Construction begins building Nova Classical Academy in St. Paul

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 


By By BD+C Staff | December 5, 2011
RJM Construction Nova Classical Academy St. Paul
RJM Construction began pre-construction planning in August, managing the design-build project and overseeing the development of

St. Louis Park, Minn.-based RJM Construction recently began building the new Nova Classical Academy building near I-35E and West 7th Street at 1455 Victoria Way in St. Paul, Minn.

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. With a move-in date of August 2012, the new location for the kindergarten through 12th grade school will include a three-story classroom wing, a central commons area and a wing for the gymnasium and music program.

RJM Construction began pre-construction planning in August, managing the design-build project and overseeing the development of the construction budget and schedule. The plans include preparing the commons area roof structure to support a green roof and terrace, as well as readying the roof over the classroom wing for solar energy panels.

In addition to RJM, the project team includes Charter Schools Development Corporation, Rivera Architecture, BKBM Engineers as the structural engineer and Rehder & Associates as the civil engineer. BD+C

Related Stories

| Sep 29, 2011

Busch Engineering, Science and Technology Residence Hall opens to Rutgers students

With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall constructed by Rutgers since 1994.

| Sep 29, 2011

CEU series examines environmental footprint and performance properties of wood, concrete, and steel

  Each course qualifies for one AIA/CES HSW/SD Learning Unit or One GBCI CE Hour.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 29, 2011

AIA Dallas names new executive director

  AIA Dallas one of only a few chapters in the U.S. to be led by an accomplished architect.

| Sep 29, 2011

Potter honored with SMSP honor

  The Society for Marketing Professional Services (SMPS) recognized Alfred K. Potter II, FSMPS, senior vice president with Gilbane Building Co., with the 2011 Weld Coxe Marketing Achievement Award (MAA). 

| Sep 28, 2011

Look who's coming to BD+C's Under-40 Leadership Summit

AEC industry "under-40 superstars" from top design and construction firms have signed up for BD+C's "Under-40 Leadership Summit."

| Sep 28, 2011

GBCI announces LEED fellow class of 2011

  LEED Fellows represent green building industry's most accomplished professionals.

| Sep 28, 2011

Bradley sponsors design studio on intelligent buildings for UWM SARUP

 The studio is taught by Gregory D. Thomson, assistant professor and co-director of the Institute for Ecological Design at UWM.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021