St. Louis Park, Minn.-based RJM Construction recently began building the new Nova Classical Academy building near I-35E and West 7th Street at 1455 Victoria Way in St. Paul, Minn.
As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. With a move-in date of August 2012, the new location for the kindergarten through 12th grade school will include a three-story classroom wing, a central commons area and a wing for the gymnasium and music program.
RJM Construction began pre-construction planning in August, managing the design-build project and overseeing the development of the construction budget and schedule. The plans include preparing the commons area roof structure to support a green roof and terrace, as well as readying the roof over the classroom wing for solar energy panels.
In addition to RJM, the project team includes Charter Schools Development Corporation, Rivera Architecture, BKBM Engineers as the structural engineer and Rehder & Associates as the civil engineer. BD+C
Related Stories
| Oct 27, 2011
iProspect selects VLK Architects for new office design
Company growth prompted iProspect to make the decision to move to a new space.
| Oct 27, 2011
ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration
Aperio will integrate with MAXXESS's eAXxess and Efusion Event Management Software packages.
| Oct 26, 2011
Metl-Span selected for re-roof project
School remained in session during the renovation and it was important to minimize the disruption as much as possible.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 25, 2011
HKS Science & Technology practice formed
Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.
| Oct 25, 2011
Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions
The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.
| Oct 25, 2011
Ritner Steel CEO elected to AISC Board
Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.
| Oct 25, 2011
Commitment to green building practices pays off
The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.