flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rising materials prices and supply chain disruptions are hurting many construction firms

Market Data

Rising materials prices and supply chain disruptions are hurting many construction firms

The same firms are already struggling to cope with pandemic impacts.


By AGC | March 15, 2021

Courtesy Pixabay

Another round of steep price increases and supply-chain disruptions are wreaking hardships on contractors, driving up construction costs and slowing projects, according to an analysis by the Associated General Contractors of America of government data released today. The data comes a day after the association released a new survey showing materials delays and price increases are affecting most contractors. Association officials urged the Biden administration to end a range of trade tariffs in place, including for Canadian lumber, that are contributing to the price increases, and to help uncork supply-chain bottlenecks.

“Both today’s producer price index report and our survey results show escalating materials costs and lengthening delivery times are making life difficult for contractors and their customers, including hospitals, schools, and other facilities needed to get the economy back on track,” said Ken Simonson, the association’s chief economist. “Project owners and budget officials should anticipate that projects will cost more and have longer—perhaps uncertain—completion times, owing to these circumstances that contractors cannot control.”

Prices for materials and services used in construction and contractors’ bid prices both declined at the beginning of the pandemic but have diverged sharply since last April, Simonson said. A government index that measures the selling price for materials and services used in new nonresidential construction jumped 1.9% from January to February and 12.8% since April 2020. Meanwhile, the producer price index for new nonresidential construction—a measure of what contractors say they would charge to erect five types of nonresidential buildings—increased only 0.3% last month and 0.5% in the 10 months since April.

“The nearly 1500 contractors who responded to our survey overwhelmingly reported rising costs, shortages, and delays in receiving needed materials, parts, and supplies,” Simonson added. “Eighty-five% of respondents said their costs for these items have risen in the past year, and a majority—58%—reported projects were taken longer than before the pandemic struck. This situation will intensify the cost squeeze apparent in the producer price index data.”

Association officials called on the president to remove tariffs on key construction materials, including steel and lumber. They also urged Washington officials to look at ways to address supply chain problems by making it easier for Canadian materials to enter the country and exploring regulatory measures to increase shipping capacity. They noted that construction firms are already absorbing the costs associated with protecting workers from the pandemic, and that materials price spikes and shipping delays are making it harder for firms to cope.

“Contractors are caught between a pandemic market that isn’t willing to pay more for projects and materials prices that continue to spike even as delivery schedules become less reliable,” said Stephen E. Sandherr, the association’s chief executive officer. “Construction firms won’t be able to thrive if rising materials prices continue to shrink already pressured profit margins.”

View producer price index data. View chart of gap between input costs and bid prices. View AGC’s survey.

Related Stories

Market Data | Sep 21, 2020

Washington is the US state with the most value of construction projects underway, says GlobalData

Of the top 10 largest projects in the Washington state, nine were in the execution stage as of August 2020.

Market Data | Sep 21, 2020

Construction employment declined in 39 states between August 2019 and 2020

31 states and DC added jobs between July and August.

Market Data | Sep 21, 2020

6 must reads for the AEC industry today: September 21, 2020

Four projects receive 202 AIA/ALA Library Building Award and Port San Antonio's new Innovation Center.

Market Data | Sep 18, 2020

Follow up survey of U.S. code officials demonstrates importance of continued investment in virtual capabilities

Existing needs highlight why supporting building and fire prevention departments at the federal, state, and local levels is critical.  

Market Data | Sep 18, 2020

6 must reads for the AEC industry today: September 18, 2020

Sagrada Familia completion date pushed back and energy code appeals could hamper efficiency progress.

Market Data | Sep 17, 2020

6 must reads for the AEC industry today: September 17, 2020

Foster + Partners-designed hospital begins construction in Cairo and heat pumps are the future for hot water.

Market Data | Sep 16, 2020

6 must reads for the AEC industry today: September 16, 2020

REI sells unused HQ building and Adjaye Associates will design The Africa Institute.

Market Data | Sep 15, 2020

7 must reads for the AEC industry today: September 15, 2020

Energy efficiency considerations for operating buildings during a pandemic and is there really a glass box paradox?

Market Data | Sep 14, 2020

6 must reads for the AEC industry today: September 14, 2020

63% of New York's restaurants could be gone by 2021 and new weapons in the apartment amenities arms race.

Market Data | Sep 11, 2020

5 must reads for the AEC industry today: September 11, 2020

Des Moines University begins construction on new campus and the role of urgent care in easing the oncology journey.

boombox1
boombox2
native1

More In Category




Giants 400

Top 100 Architecture Engineering Firms for 2024

Stantec, HDR, Page, HOK, and Arcadis North America top Building Design+Construction's ranking of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in BD+C's 2024 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021