The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.


By Viega LLC Sponsored Content | September 13, 2014
Max Planck Florida Institute, Jupiter, Fla.
Max Planck Florida Institute, Jupiter, Fla.

Right Way Plumbing has installed Viega ProPress® systems at the Max Planck Florida Institute in Jupiter, Fla. The 19 different applications in this prestigious facility include the air conditioner condensate lines, lab air ventilation, gas ventilation, vacuum lines, temperate water returns and hot water recirculation among others.

“It’s in the potable hot and cold, nonpotable hot and cold, gas regulator vents, temperate hot water, supplies, returns and loops around three levels of the building,” said Jeff Wilson, Project Manager at Right Way Plumbing Company in Sunrise, FL. “We were on a really tight schedule with all the changes during the course of the project. Right Way was the first one to meet the schedule and Viega ProPress was a large part of that.” 

The Max Planck Florida Institute consists of a three-story, 100,000-square-foot scientific research facility with more than 115,000 feet of plumbing, with 30,000 feet of copper joined with Viega ProPress fittings.

“Being able to use Viega ProPress in here helped us to not only achieve the schedule but beat the schedule and not have to worry about reworking stuff because of leaks,” said Daniel Rourke, Senior Vice President of Right Way Plumbing. “Viega ProPress has a lot of advantages, as in speed and the comfort in knowing that once it’s pressed that the system is going to last the life of the building and we won’t have to worry about a callback later.”

Founded in Miami in 1931, Right Way Plumbing Company builds lasting relationships with customers by providing superior service at competitive prices without compromising quality. 

 

 
Viega ProPress® systems

 

Rourke believes that Viega ProPress was the best choice for the Max Planck project because of the sheer number of connections that had to be made in the short amount of time allotted.

“We probably saved 50% of the time over other systems,” Rourke said. “We’ve not had one leak. We’ve installed hundreds of thousands of joints and we’ve not had one failure.”

“The Viega ProPress system is the cleanest system that you can install,” Wilson said. “When you get to a flushing point at the end of the project, you flush the system with Viega ProPress, you’re clean. It’s done immediately. With a solder or welded system, we may have to flush for a week before we get to our chlorination point. With a project like this, it would have taken us a week to flush it. Instead we were able to do it in a couple of days.”

The Max Planck Florida Institute is the first Max Planck facility outside of Europe. According to Rourke, the Max Planck Florida Institute has 300 different rooms dedicated to lab work with multiple systems piped to each room.

“Using the Viega ProPress system helped us to cut our labor down,” Rourke said. “Once you put it in, you can rest assured that you’re not going to have a leak. The feature I love about Viega ProPress is the ability to see that the joint is pressed before you even turn it on.” 

Viega LLC
1.800.976.9819
insidesales@viega.us
www.viega.us

Related Stories

| Feb 23, 2012

Federal budget cuts put major building projects on hold

A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 22, 2012

Siemens earns LEED certification for Maryland office

The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.

| Feb 22, 2012

CISCO recognizes Gilbane for quality construction, design, and safety

The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. 

| Feb 22, 2012

Perkins Eastman expands portfolio in China and Vietnam

Recent awards, project progress signal ongoing commitment to region.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 21, 2012

Top 10 trends in commercial lenders’ environmental due diligence

EDR offers free webinar on February 22, 2012 at 1 p.m.

| Feb 21, 2012

Three Goettsch leaders elevated to AIA College of Fellows

Honor recognizes significant contributions to architecture and society. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021