Right Way Plumbing finishes first at Max Planck Florida Institute

Sponsored Content

Right Way Plumbing finishes first at Max Planck Florida Institute

The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.


By Viega LLC Sponsored Content | September 13, 2014
Max Planck Florida Institute, Jupiter, Fla.
Max Planck Florida Institute, Jupiter, Fla.

Right Way Plumbing has installed Viega ProPress® systems at the Max Planck Florida Institute in Jupiter, Fla. The 19 different applications in this prestigious facility include the air conditioner condensate lines, lab air ventilation, gas ventilation, vacuum lines, temperate water returns and hot water recirculation among others.

“It’s in the potable hot and cold, nonpotable hot and cold, gas regulator vents, temperate hot water, supplies, returns and loops around three levels of the building,” said Jeff Wilson, Project Manager at Right Way Plumbing Company in Sunrise, FL. “We were on a really tight schedule with all the changes during the course of the project. Right Way was the first one to meet the schedule and Viega ProPress was a large part of that.” 

The Max Planck Florida Institute consists of a three-story, 100,000-square-foot scientific research facility with more than 115,000 feet of plumbing, with 30,000 feet of copper joined with Viega ProPress fittings.

“Being able to use Viega ProPress in here helped us to not only achieve the schedule but beat the schedule and not have to worry about reworking stuff because of leaks,” said Daniel Rourke, Senior Vice President of Right Way Plumbing. “Viega ProPress has a lot of advantages, as in speed and the comfort in knowing that once it’s pressed that the system is going to last the life of the building and we won’t have to worry about a callback later.”

Founded in Miami in 1931, Right Way Plumbing Company builds lasting relationships with customers by providing superior service at competitive prices without compromising quality. 

 

 
Viega ProPress® systems

 

Rourke believes that Viega ProPress was the best choice for the Max Planck project because of the sheer number of connections that had to be made in the short amount of time allotted.

“We probably saved 50% of the time over other systems,” Rourke said. “We’ve not had one leak. We’ve installed hundreds of thousands of joints and we’ve not had one failure.”

“The Viega ProPress system is the cleanest system that you can install,” Wilson said. “When you get to a flushing point at the end of the project, you flush the system with Viega ProPress, you’re clean. It’s done immediately. With a solder or welded system, we may have to flush for a week before we get to our chlorination point. With a project like this, it would have taken us a week to flush it. Instead we were able to do it in a couple of days.”

The Max Planck Florida Institute is the first Max Planck facility outside of Europe. According to Rourke, the Max Planck Florida Institute has 300 different rooms dedicated to lab work with multiple systems piped to each room.

“Using the Viega ProPress system helped us to cut our labor down,” Rourke said. “Once you put it in, you can rest assured that you’re not going to have a leak. The feature I love about Viega ProPress is the ability to see that the joint is pressed before you even turn it on.” 

Viega LLC
1.800.976.9819
insidesales@viega.us
www.viega.us

Related Stories

| May 28, 2013

Minneapolis transit hub will double as cultural center [slideshow]

The Building Team for the Interchange project in downtown Minneapolis is employing the principles of "open transit" design to create a station that is one part transit, one part cultural icon.

| May 24, 2013

James Turrell's art installation turns Guggenheim Museum into 'skyspace'

James Turrell, an artist whose projects are more properly defined as "light sculptures," will have a major installation at the Guggenheim Museum this summer, turning Frank Lloyd Wright's famed serpentine atrium into a show of shifting colors and textures. The site-specific project, Aten Reign, will run from June 21 to September 25.

| May 24, 2013

First look: Revised plan for Amazon's Seattle HQ and 'biodome'

NBBJ has released renderings of a revised plan for Amazon's new three-block headquarters in Seattle. The proposal would replace a previously approved six-story office building with a three-unit "biodome."

| May 23, 2013

Supertall 'Sky City' will house 4,400 families in Changsha, China

Broad Sustainable Building has completed a long and arduous approval process, and is starting excavation and construction on Sky City in June, 2013. The proposed "world's tallest building" will be a mixed-use project that could accommodate life and work needs of up to 30,000 people.

| May 23, 2013

Are design-build contracts killing small architecture firms?

Are federal design-build contract laws unfair to small firms? AIA thinks so, citing an interesting fact: an architecture firm spends a median of $260,000 to compete for a design-build project.

| May 23, 2013

Is the 'bring your own device' discussion stumping your IT group?

A new twist to the communication challenge most companies and IT departments face is the “bring your own device,” or BYOD, conundrum. I call it a conundrum because it is stumping many IT professionals.

| May 23, 2013

Portland State University’s School of Architecture launches Center for Public Interest Design

Portland State University’s School of Architecture is proud to announce the launch of its new Center for Public Interest Design, a research center that aims to investigate and utilize the power of design to make social, economic and environmental change in disadvantaged communities worldwide. The Center is the first of its kind in the nation.

| May 22, 2013

Return of retail? Rent growth seen in recovering markets

Like digging a ditch with a spoon, retail demand driven by population growth has eaten away at the supply of available store space in the markets that have been slowest to recover from the downturn. Vacancy rates are reaching a point that will give at least some landlords in every market the clout to demand slightly higher rents.

| May 22, 2013

New ASTM standard enhances hollow structural sections

ASTM A1085 is a big step forward in simplifying HSS design and usage, thereby making it a more desirable option for HSS.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021