Right Way Plumbing finishes first at Max Planck Florida Institute

Sponsored Content

Right Way Plumbing finishes first at Max Planck Florida Institute

The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.


By Viega LLC Sponsored Content | September 13, 2014
Max Planck Florida Institute, Jupiter, Fla.
Max Planck Florida Institute, Jupiter, Fla.

Right Way Plumbing has installed Viega ProPress® systems at the Max Planck Florida Institute in Jupiter, Fla. The 19 different applications in this prestigious facility include the air conditioner condensate lines, lab air ventilation, gas ventilation, vacuum lines, temperate water returns and hot water recirculation among others.

“It’s in the potable hot and cold, nonpotable hot and cold, gas regulator vents, temperate hot water, supplies, returns and loops around three levels of the building,” said Jeff Wilson, Project Manager at Right Way Plumbing Company in Sunrise, FL. “We were on a really tight schedule with all the changes during the course of the project. Right Way was the first one to meet the schedule and Viega ProPress was a large part of that.” 

The Max Planck Florida Institute consists of a three-story, 100,000-square-foot scientific research facility with more than 115,000 feet of plumbing, with 30,000 feet of copper joined with Viega ProPress fittings.

“Being able to use Viega ProPress in here helped us to not only achieve the schedule but beat the schedule and not have to worry about reworking stuff because of leaks,” said Daniel Rourke, Senior Vice President of Right Way Plumbing. “Viega ProPress has a lot of advantages, as in speed and the comfort in knowing that once it’s pressed that the system is going to last the life of the building and we won’t have to worry about a callback later.”

Founded in Miami in 1931, Right Way Plumbing Company builds lasting relationships with customers by providing superior service at competitive prices without compromising quality. 

 

 
Viega ProPress® systems

 

Rourke believes that Viega ProPress was the best choice for the Max Planck project because of the sheer number of connections that had to be made in the short amount of time allotted.

“We probably saved 50% of the time over other systems,” Rourke said. “We’ve not had one leak. We’ve installed hundreds of thousands of joints and we’ve not had one failure.”

“The Viega ProPress system is the cleanest system that you can install,” Wilson said. “When you get to a flushing point at the end of the project, you flush the system with Viega ProPress, you’re clean. It’s done immediately. With a solder or welded system, we may have to flush for a week before we get to our chlorination point. With a project like this, it would have taken us a week to flush it. Instead we were able to do it in a couple of days.”

The Max Planck Florida Institute is the first Max Planck facility outside of Europe. According to Rourke, the Max Planck Florida Institute has 300 different rooms dedicated to lab work with multiple systems piped to each room.

“Using the Viega ProPress system helped us to cut our labor down,” Rourke said. “Once you put it in, you can rest assured that you’re not going to have a leak. The feature I love about Viega ProPress is the ability to see that the joint is pressed before you even turn it on.” 

Viega LLC
1.800.976.9819
insidesales@viega.us
www.viega.us

Related Stories

Industry Research | Jan 23, 2024

Leading economists forecast 4% growth in construction spending for nonresidential buildings in 2024

Spending on nonresidential buildings will see a modest 4% increase in 2024, after increasing by more than 20% last year according to The American Institute of Architects’ latest Consensus Construction Forecast. The pace will slow to just over 1% growth in 2025, a marked difference from the strong performance in 2023.

Giants 400 | Jan 23, 2024

Top 110 Medical Office Building Architecture Firms for 2023

SmithGroup, CannonDesign, E4H Environments for Health Architecture, and Perkins Eastman top BD+C's ranking of the nation's largest medical office building architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Giants 400 | Jan 22, 2024

Top 100 Outpatient Facility Architecture Firms for 2023

HDR, CannonDesign, Stantec, Perkins&Will, and ZGF top BD+C's ranking of the nation's largest outpatient facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to outpatient medical buildings, including cancer centers, heart centers, urgent care facilities, and other medical centers.

Construction Costs | Jan 22, 2024

Construction material prices continue to normalize despite ongoing challenges

Gordian’s most recent Quarterly Construction Cost Insights Report for Q4 2023 describes an industry still attempting to recover from the impact of COVID. This was complicated by inflation, weather, and geopolitical factors that resulted in widespread pricing adjustments throughout the construction materials industries.

Transit Facilities | Jan 22, 2024

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

Hotel Facilities | Jan 22, 2024

U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline

The hotel construction pipeline hit record project counts at Q4, with the addition of 260 projects and 21,287 rooms over last quarter, according to Lodging Econometrics.

Modular Building | Jan 19, 2024

Virginia is first state to adopt ICC/MBI offsite construction standards

Virginia recently became the first state to adopt International Code Council/Modular Building Institute off-site construction standards.

Office Buildings | Jan 19, 2024

How to strengthen office design as employees return to work

Adam James, AIA, Senior Architect, Design Collaborative, shares office design tips for the increasingly dynamic workplace.

Modular Building | Jan 19, 2024

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

Adaptive Reuse | Jan 18, 2024

Coca-Cola packaging warehouse transformed into mixed-use complex

The 250,000-sf structure is located along a now defunct railroad line that forms the footprint for the city’s multi-phase Beltline pedestrian/bike path that will eventually loop around the city.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021