Right Way Plumbing finishes first at Max Planck Florida Institute

Sponsored Content

Right Way Plumbing finishes first at Max Planck Florida Institute

The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.


By Viega LLC Sponsored Content | September 13, 2014
Max Planck Florida Institute, Jupiter, Fla.
Max Planck Florida Institute, Jupiter, Fla.

Right Way Plumbing has installed Viega ProPress® systems at the Max Planck Florida Institute in Jupiter, Fla. The 19 different applications in this prestigious facility include the air conditioner condensate lines, lab air ventilation, gas ventilation, vacuum lines, temperate water returns and hot water recirculation among others.

“It’s in the potable hot and cold, nonpotable hot and cold, gas regulator vents, temperate hot water, supplies, returns and loops around three levels of the building,” said Jeff Wilson, Project Manager at Right Way Plumbing Company in Sunrise, FL. “We were on a really tight schedule with all the changes during the course of the project. Right Way was the first one to meet the schedule and Viega ProPress was a large part of that.” 

The Max Planck Florida Institute consists of a three-story, 100,000-square-foot scientific research facility with more than 115,000 feet of plumbing, with 30,000 feet of copper joined with Viega ProPress fittings.

“Being able to use Viega ProPress in here helped us to not only achieve the schedule but beat the schedule and not have to worry about reworking stuff because of leaks,” said Daniel Rourke, Senior Vice President of Right Way Plumbing. “Viega ProPress has a lot of advantages, as in speed and the comfort in knowing that once it’s pressed that the system is going to last the life of the building and we won’t have to worry about a callback later.”

Founded in Miami in 1931, Right Way Plumbing Company builds lasting relationships with customers by providing superior service at competitive prices without compromising quality. 

 

 
Viega ProPress® systems

 

Rourke believes that Viega ProPress was the best choice for the Max Planck project because of the sheer number of connections that had to be made in the short amount of time allotted.

“We probably saved 50% of the time over other systems,” Rourke said. “We’ve not had one leak. We’ve installed hundreds of thousands of joints and we’ve not had one failure.”

“The Viega ProPress system is the cleanest system that you can install,” Wilson said. “When you get to a flushing point at the end of the project, you flush the system with Viega ProPress, you’re clean. It’s done immediately. With a solder or welded system, we may have to flush for a week before we get to our chlorination point. With a project like this, it would have taken us a week to flush it. Instead we were able to do it in a couple of days.”

The Max Planck Florida Institute is the first Max Planck facility outside of Europe. According to Rourke, the Max Planck Florida Institute has 300 different rooms dedicated to lab work with multiple systems piped to each room.

“Using the Viega ProPress system helped us to cut our labor down,” Rourke said. “Once you put it in, you can rest assured that you’re not going to have a leak. The feature I love about Viega ProPress is the ability to see that the joint is pressed before you even turn it on.” 

Viega LLC
1.800.976.9819
insidesales@viega.us
www.viega.us

Related Stories

Architects | Mar 5, 2024

Riken Yamamoto wins 2024 Pritzker Architecture Prize

The Pritzker Architecture Prize announces Riken Yamamoto, of Yokohama, Japan, as the 2024 Laureate of the Pritzker Architecture Prize, the award that is regarded internationally as architecture’s highest honor.

Office Buildings | Mar 5, 2024

Former McDonald’s headquarters transformed into modern office building for Ace Hardware

In Oak Brook, Ill., about 15 miles west of downtown Chicago, McDonald’s former corporate headquarters has been transformed into a modern office building for its new tenant, Ace Hardware. Now for the first time, Ace Hardware can bring 1,700 employees from three facilities under one roof.

Green | Mar 5, 2024

New York City’s Green Economy Action Plan aims for building decarbonization

New York City’s recently revealed Green Economy Action Plan includes the goals of the decarbonization of buildings and developing a renewable energy system. The ambitious plan includes enabling low-carbon alternatives in the transportation sector and boosting green industries, aiming to create more than 12,000 green economy apprenticeships by 2040.

Lighting | Mar 4, 2024

Illuminating your path to energy efficiency

Design Collaborative's Kelsey Rowe, PE, CLD, shares some tools, resources, and next steps to guide you through the process of lighting design.

MFPRO+ News | Mar 1, 2024

Housing affordability, speed of construction are top of mind for multifamily architecture and construction firms

The 2023 Multifamily Giants get creative to solve the affordability crisis, while helping their developer clients build faster and more economically. 

Multifamily Housing | Feb 29, 2024

Manny Gonzalez, FAIA, inducted into Best in American Living Awards Hall of Fame

Manny Gonzalez, FAIA, has been inducted into the BALA Hall of Fame.

K-12 Schools | Feb 29, 2024

Average age of U.S. school buildings is just under 50 years

The average age of a main instructional school building in the United States is 49 years, according to a survey by the National Center for Education Statistics (NCES). About 38% of schools were built before 1970. Roughly half of the schools surveyed have undergone a major building renovation or addition.

MFPRO+ Research | Feb 28, 2024

New download: BD+C's 2023 Multifamily Amenities report

New research from Building Design+Construction and Multifamily Pro+ highlights the 127 top amenities that developers, property owners, architects, contractors, and builders are providing in today’s apartment, condominium, student housing, and senior living communities.

AEC Tech | Feb 28, 2024

How to harness LIDAR and BIM technology for precise building data, equipment needs

By following the Scan to Point Cloud + Point Cloud to BIM process, organizations can leverage the power of LIDAR and BIM technology at the same time. This optimizes the documentation of existing building conditions, functions, and equipment needs as a current condition and as a starting point for future physical plant expansion projects. 

Data Centers | Feb 28, 2024

What’s next for data center design in 2024

Nuclear power, direct-to-chip liquid cooling, and data centers as learning destinations are among the emerging design trends in the data center sector, according to Scott Hays, Sector Leader, Sustainable Design, with HED. 

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021