flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rich Smith named President at Henderson Engineers

Rich Smith named President at Henderson Engineers


February 7, 2013
L to R  Dana Kettle, Dave Haake, Duane Henderson, Rich Smith, Rick Lahm, Tony P
L to R Dana Kettle, Dave Haake, Duane Henderson, Rich Smith, Rick Lahm, Tony Pianalerson, Rich Smith, Rick Lahm, Tony Pianalto

LENEXA, Kan. - February 7, 2013 - Henderson Engineers, Inc. (HEI), a national top 10 architectural engineering company, recently announced several executive level promotions to plan for long term stability and success of the company.

Rich Smith has been promoted to President of HEI. He will serve as a liaison to HEI’s clients and will be the primary public representative of the company. As President, Smith will focus on the overall vision and brand of the company. Additionally, Smith will remain heavily involved in business development and assisting with diversifying and growing the firm.

Duane Henderson will remain as CEO. He will continue to be involved in the daily operations and help lead of the company through the transition period. Henderson has been CEO since 1988; his father Fran founded the company in 1970.

Dave Haake has assumed the role of Chief Operations Officer. His responsibilities will include overseeing the daily operations of the company, including internal design teams, specialty divisions, and branch offices.

Dana Kettle has been promoted to Chief Financial Officer; she will oversee and manage all financial aspects of the firm.

Rick Lahm has stepped down as CFO, a position he has held since 1990. Lahm will assume the role of Board Treasurer.

Tony Pianalto has assumed the role of Chief Technical Officer. He will oversee and manage the technical engineering aspects of the firm, including quality control, training, standards, building information modeling, sustainability and commissioning.

“HEI’s Board of Directors examined the roles and organization of our company and interviewed key personnel through a six month discovery period,” said Duane Henderson, CEO. “We wanted to make sure we were taking into consideration our shareholders’ thoughts and ideas with regard to the future of the company.”

“The plan presented will allow for a smooth leadership transition for our company,” said Rich Smith, President. “I’m excited about the opportunity and the changes and feel it will strengthen the management structure as our firm continues to grow both regionally and nationally.”

About Henderson Engineers, Inc.

Henderson Engineers, Inc. was founded in 1970 and provides mechanical, electrical, plumbing and refrigeration design services through its headquarters in Kansas City, as well as branch offices in Bentonville, Dallas, Houston, Las Vegas, New York Metro, Philadelphia, Phoenix, and Tampa. Licensed in all 50 states, Henderson is comprised of over 450 employees including 150 Licensed Engineers and over 100 LEED® Accredited Professionals. In addition to its core services, Henderson Engineers, Inc. houses four specialty divisions: Impact Illumination (architectural lighting), Fire Dynamics (fire protection and code consulting), Collective Tech/ADG (comprehensive technology, security, audio visual, and acoustical design), and Outcome Cx (Commissioning). For more information visit www.hei-eng.com.

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021