flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Restoration Millwork exterior trim achieves GreenCircle certification

Restoration Millwork exterior trim achieves GreenCircle certification

Made from cellular polyvinyl chloride, the full line of Restoration Millwork trim, beadboard and accessories is engineered to look, feel and work like top-grade lumber.


By Posted by Tim Gregorski, Senior Editor | June 12, 2012
Restoration Millwork trim is made with a long-lasting, low-maintenance material
Restoration Millwork trim is made with a long-lasting, low-maintenance material that is resistant to rotting, warping, moisture

CertainTeed achieved GreenCircle certification for its Restoration Millwork Exterior Trim, enhancing the sustainable appeal and environmental transparency of the product line.

The third-party certification was conducted by GreenCircle Certified, LLC, and the process included a comprehensive review of the manufacturing process and products, verifying the 21% recycled content of the product.

“Securing an independent third-party certification of the recycled content within our Restoration Millwork products reinforces our overarching commitment to environmental responsibility,” says Rick Brinton, marketing manager for Restoration Millwork at CertainTeed Siding Products Group. “In addition to GreenCircle certification, the long-lasting performance and durability of Restoration Millwork make it an ideal choice for sustainable building projects.”

In order to verify and certify recycled content claims, GreenCircle conducted a detailed evaluation of the Restoration Millwork product line and the company’s manufacturing operations in Social Circle, Ga. The claims were verified for conformance with International Organization for Standardization (ISO) 14021 Environmental Labels and Declarations requirements. 

Made from cellular polyvinyl chloride, the full line of Restoration Millwork trim, beadboard and accessories is engineered to look, feel and work like top-grade lumber. Unlike wood, however, it is made with a long-lasting, low-maintenance material that is resistant to rotting, warping, moisture and insects. It can be cut using ordinary woodworking tools and fastened with nails or screws. It is highly resistant to yellowing caused by UV rays, resists freezing during winter months, features a Class A (Class 1) flame spread classification and is backed by a 25-year limited warranty. +

Related Stories

| Jan 31, 2012

KBE selected for school project in Waterbury, Conn.

Located adjacent to the existing elementary school, the $28 million, 82,000 s/f Pre-K to eighth Grade school is expected to host its first students in the fall of 2013.

| Jan 31, 2012

Construction Law Firm Allensworth & Porter, LLP adds May to the firm

Prior to joining Allensworth & Porter, May served as the staff attorney for the Texas Civil Justice League, and was responsible for drafting, analyzing, and tracking civil justice and business-related legislation during the 82nd Legislative Session. 

| Jan 31, 2012

Skanska USA Civil promotes Bradley to southeast general superintendent

In Bradley’s new position, he will manage field operations for all Skanska Civil projects in the southeast.

| Jan 30, 2012

Siemens and Air-Ex Team deliver building controls training to Mt. San Antonio College students

Siemens contributes training modules and technology to support hands-on courses.

| Jan 30, 2012

Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.

Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.

| Jan 27, 2012

Caterpillar reports record sales and profit for 4Q and full-year 2011

Momentum carries into 2012 with sales and revenues outlook raised to $68 to $72 billion.

| Jan 27, 2012

Smith Seckman Reid opens two new offices

Smith Seckman Reid, Inc. (SSR), an engineering design and facility consulting firm, has opened two new offices, one in Chicago, the other in Washington, D.C.

| Jan 27, 2012

BRB Architects designs new campus center for Molloy College

Intended to be the centerpiece of the College’s transformation from a commuter college to a 24-hour learning community, the “Public Square” will support student life with spaces such as a café, lounges, study rooms, student club space, a bookstore and an art gallery.

| Jan 27, 2012

Columbia University’s New Core Laboratory aims for LEED Silver

Construction manager Sordoni Construction Co. along with the design team of Payette Architects and Vanderweil Engineers will provide design and construction services to renovate the majority of the existing Core Lab building to create the new Lamont Center for Bio-Geochemistry.

| Jan 26, 2012

Three dead, 16 missing in Rio buildings collapse

The buildings, one 20 floors high, collapsed on Wednesday night in a cloud of dust and smoke just one block away from the city's historic Municipal Theater.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021