A report by the New Buildings Institute highlights where LEED certification aids in the goal of achieving net zero energy.
“Getting to Zero Status Update and List of Zero Energy (“ZE”) Projects for 2018” is a digest of almost 500 certified, verified and emerging zero energy projects in the U.S. and Canada. The analysis shows that 70% ZE Verified projects are LEED-certified or registered with LEED. Most of those reached either Platinum or Gold certification levels.
A LEED v4 credit for projects that achieve increasing levels of energy performance beyond standard requirements encourages aggressive reductions in energy usage, the report says. More points are awarded proportionally with higher levels of improvement from the baseline. For example, a new construction project that demonstrates a 50% reduction in energy usage from the baseline has the opportunity to earn as many as 18 points.
Nearly all of the LEED Energy and Atmosphere credits support the advanced energy performance necessary for zero energy. LEED v4 requires and rewards energy efficiency through a whole-building energy simulation or prescriptive compliance with ASHRAE or other rigorous energy standards and methods.
Related Stories
Codes and Standards | Apr 23, 2020
COVID-19 epidemic demonstrates value of flexible hospital space
Some rooms being repurposed for ICU care.
Codes and Standards | Apr 15, 2020
Embodied carbon footprint can be reduced by using conventional materials
High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.
Coronavirus | Apr 13, 2020
COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open
Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online.
Codes and Standards | Apr 13, 2020
Design competition focuses on reducing urban heat island effect
Cool Abu Dhabi aims to transform urban life in the Middle East.
Codes and Standards | Apr 13, 2020
What building science says about reducing COVID-19 transmission
Impact of temperature and relative humidity is unclear.
Codes and Standards | Apr 9, 2020
Owners retrofitting properties, monitoring performance during epidemic
Covid-19 outbreak may lead employers to reevaluate office commitments.
Codes and Standards | Apr 7, 2020
Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave
Includes fact sheets for employees, employers, and a questions and answers document.
Codes and Standards | Apr 1, 2020
Standards and codes meetings halted, postponed
ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.
Codes and Standards | Mar 26, 2020
Ransomware attack on Canadian contractor underscores need for cybersecurity
Victimized company Bird Construction has defense, law enforcement contracts.
Codes and Standards | Mar 23, 2020
Contractors should scrutinize contracts carefully amid Covid-19 crisis
Compliance with time-sensitive notice requirements and careful documentation required.