flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Report finds credit crunch accounts for 20% of nation’s stalled projects

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.


By By BD+C Staff | November 29, 2011
AIA finance design construction
The lack of financing especially to the design and construction sector, which accounts for $1 in $9 of U.S. Gross Domestic Produ

The American Institute of Architects (AIA) released a comprehensive report, which concludes that the major obstacle holding back job creation in the U.S. is the persistent lack of construction financing, despite record low interest rates.

“This report should lay to rest any doubt about what is a key source for holding back job creation in the United States,’ said Kermit Baker, chief economist of the AIA. “It is the lack of financing especially to the design and construction sector, which accounts for $1 in $9 of U.S. Gross Domestic Product.”

The report found:

  • The share of projects stalled due to financing problems through August 2011 has almost doubled since 2008
  • One-in-five stalled projects are directly resulting from financing problems
  • Financing problems account for a higher share of stalled projects in the education and multi-family sector
  • More than 25% of projects reported as stalled due to the credit crunch could qualify for LEED, Green Globes, or other green certification status
  • Financing issues are less of a factor holding back projects in the manufacturing, private healthcare, and retail environments

“Whatever, the reason – be it over-regulation, the threat of a double-dip recession or the reluctance to have too many loans on the books, lenders are just not lending to a major job-producing sector of the American economy,” Baker noted. “Until more credit is extended, the potential of non-residential construction to promote greater levels of economic growth will not be realized.” BD+C

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021