flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reopened offices raise liability risk for businesses and owners

Codes and Standards

Reopened offices raise liability risk for businesses and owners

Risks may not be covered by property insurance.


By Peter Fabris, Contributing Editor | June 8, 2020

Courtesy Pixabay

After offices and other places of business reopen following COVID-19 shutdowns, tenants and owners face increased legal liability, and property insurance plans may not cover this risk.

If an employee or guest contracts the disease, the prospect of a lawsuit puts companies and property owners at risk. Though most re-openings come with stringent measures to protect the health of workers and visitors, those actions may not be enough to protect a company from liability if someone catches COVID-19 within their property.

Companies have to follow the necessary guidelines to safeguard their buildings from COVID-19 transmission, but they also must ensure compliance with those measures, a lawyer interviewed by GlobeSt advises. Plaintiffs would not necessarily have a difficult time proving that they were infected at a particular location.

The prevalence of mobile devices, private security cameras, and other tracking and tracing methods, there could be enough data to determine who was within six feet of an infected person. If businesses adhere to guidelines to prevent disease transmission, though, they stand a much better chance of prevailing in court.

Related Stories

Codes and Standards | Jan 5, 2022

Boston drops parking requirements for affordable housing

Measure expected to spur new projects.

Codes and Standards | Jan 4, 2022

Dept. of Energy Better Climate Challenge aims for 50% GHG emission reduction by 2030

Program offers technical assistance and peer-to-peer knowledge sharing.

Codes and Standards | Jan 4, 2022

Architects at New York firm take steps to unionize

Support for unionization reported at two other New York firms.

Codes and Standards | Jan 3, 2022

Biden’s executive order for a carbon-neutral government includes green materials mandate

As a driver of demand, federal procurement impact could ripple through the economy.

Codes and Standards | Jan 3, 2022

Controversial California solar power incentive proposal would reduce subsidies

Plan intended to encourage customers to install power storage systems.

Codes and Standards | Jan 3, 2022

New York City bans new gas hookups

Applies to gas stoves, boilers, and heaters in new buildings and buildings that undergo gut renovations.

Codes and Standards | Jan 3, 2022

New engineering guide on fire safety for very tall buildings released

Topics include emergency egress, fire resistance, building envelope, suppression, detection, alarms, and smoke control.

Codes and Standards | Dec 22, 2021

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

New document provides up-to-date, coordinated loading provisions for general structural design.

Codes and Standards | Dec 21, 2021

Outdated and redundant building codes plague St. Louis area development

Region’s combined codes nearly double the length of the IRS Code.

Digital Twin | Dec 20, 2021

Groups ally to advance augmented reality and digital twin technology

AREA and Digital Twin Consortium to work on improving how technology components interoperate.

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021