When Nashville built its new stadium for the Tennessee Titans, the former headquarters of the Nashville Bridge Company were spared demolition. Built in 1908, with additions made to the 5,000 square foot building in 1924 and 1965, the compound was modernized by Hastings Architecture Associates as part of the Nashville Riverfront Master Plan. Renovations were recently completed, including a newly-built modern wing, and the multipurpose faciilty has been re-dubbed The Bridge Building. It now offers spaces for meetings, parties, weddings, and other events.
The adaptive reuse required significant modifications to reflect sustainability concerns, which have resulted in a 46 percent decrease in annual energy costs, including solar hot water, a ground source heat pump, automated electrical monitoring, LED illumination, and smart operable windows.
Storm water runoff from the 7,300 square feet of roof and patio space, along with rooftop air conditioning condensate, is collected and reused, and is expected to total nearly 173,000 gallons, which will be utilized by low-flow toilets, to reduce water usage by as much as 32 percent.
Designed to achieve LEED Platinum certification, The Bridge Building shares services with other projects that are part of the Nashville Riverfront Master Plan, such as irrigation water that is captured in a rainwater cistern and green space that doubles as a permeable parking surface. The Plan incorporated reclaiming of wetlands to revitalize three miles of Cumberland riverfront that passes through downtown Nashville.
(http://www.jetsongreen.com/2013/05/cornerstone-of-nashville-riverfront-master-plan-showcases-sustainable-adaptive-reuse.html)
Related Stories
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Oct 11, 2011
ThyssenKrupp elevator cabs validated by UL Environment
The conclusive and independent third-party validation process is another step toward a green product line.
| Oct 11, 2011
Ballard Spahr launches real estate recovery group
The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment.
| Oct 11, 2011
Onex completes investment in JELD-WEN
With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.
| Oct 7, 2011
GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings.