When Nashville built its new stadium for the Tennessee Titans, the former headquarters of the Nashville Bridge Company were spared demolition. Built in 1908, with additions made to the 5,000 square foot building in 1924 and 1965, the compound was modernized by Hastings Architecture Associates as part of the Nashville Riverfront Master Plan. Renovations were recently completed, including a newly-built modern wing, and the multipurpose faciilty has been re-dubbed The Bridge Building. It now offers spaces for meetings, parties, weddings, and other events.
The adaptive reuse required significant modifications to reflect sustainability concerns, which have resulted in a 46 percent decrease in annual energy costs, including solar hot water, a ground source heat pump, automated electrical monitoring, LED illumination, and smart operable windows.
Storm water runoff from the 7,300 square feet of roof and patio space, along with rooftop air conditioning condensate, is collected and reused, and is expected to total nearly 173,000 gallons, which will be utilized by low-flow toilets, to reduce water usage by as much as 32 percent.
Designed to achieve LEED Platinum certification, The Bridge Building shares services with other projects that are part of the Nashville Riverfront Master Plan, such as irrigation water that is captured in a rainwater cistern and green space that doubles as a permeable parking surface. The Plan incorporated reclaiming of wetlands to revitalize three miles of Cumberland riverfront that passes through downtown Nashville.
(http://www.jetsongreen.com/2013/05/cornerstone-of-nashville-riverfront-master-plan-showcases-sustainable-adaptive-reuse.html)
Related Stories
| Jul 12, 2012
Chicago Public Schools names Lend Lease team as construction manager
Under this Capital Improvement Program, the Lend Lease team will be responsible for renovation and life safety work at over 100 Chicago Public Schools across the City.
| Jul 12, 2012
Cramer joins Gilbane’s NYC Business Development Team
New Business Development Manager brings over 30 years of experience to Gilbane.
| Jul 12, 2012
Cardoso joins Margulies Perruzzi Architects
Senior architect brings experience, leadership to firm’s healthcare practice.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jul 11, 2012
New BDC University course: Design Criteria for Ceramic Tile/Stone Installations
Everyone that successfully completed to course will receive 1.0 HSW/LU AIA LU.
| Jul 11, 2012
Perkins+Will designs new home for Gateway Community College
Largest one-time funded Connecticut state project and first designed to be LEED Gold.
| Jul 11, 2012
HOK honored with Los Angeles architectural award
42nd annual awards from the Los Angeles Business Council honor design excellence.
| Jul 11, 2012
Skanska relocates its Philadelphia metro office
Construction firm’s new 19,100-sf office targets LEED Gold certification.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
NELSON, Torchia announce merger
Former competitors seek competitive advantage by joining forces.