LargaVista Companies, a second generation real estate development, management and investment firm, and Related Companies have formed a joint venture partnership for the development of 300 Lafayette in SoHo.
The site contains the block front on East Houston Street, bounded by Lafayette and Crosby Streets in Manhattan, and will be transformed into a seven-story, mixed-use retail and office tower. The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.
The proposed development of 300 Lafayette Street, designed by COOKFOX Architects, consists of a distinctive 83,000-sf retail and boutique office building featuring floor-to-ceiling glazing set in terra-cotta and limestone frames. The environmentally friendly design incorporates a number of sustainable features and abundant outdoor space on several landscaped terraces.
"By joining forces with Related, we are introducing an exceptionally strong financial partner with proven expertise in delivering world-class properties like 300 Lafayette," said Marcello Porcelli, President of LargaVista. "This project will benefit tremendously from Related's wealth of experience in building and leasing some of the most complex projects and demanding designs in major markets throughout the globe."
The CBRE team of Mary Ann Tighe, CEO of the New York Tri-State Region, and Tom Duke, Vice President, served as real estate consultants to LargaVista at 300 Lafayette. Gregory Tosko, Vice Chairman, and Lauren Crowley, Vice President, joined the CBRE team advising LargaVista on this transaction.
Related Stories
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.
Codes and Standards | Apr 6, 2015
Industry groups petition for change order reform on federal projects
Nine design and construction associations ask for assurance that funds available for additional work.
High-rise Construction | Apr 6, 2015
Melbourne tower will light up depending on weather
The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology.
BIM and Information Technology | Apr 3, 2015
French startup develops drone camera that overlays video with 3D images
The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.
Libraries | Apr 2, 2015
6 award-winning libraries showcase next-gen design strategies
The new Cedar Rapids Public Library and the restored Slover Library in Norfolk, Va., are among six breakthrough projects honored with 2015 AIA/ALA Library Building Awards.
Contractors | Apr 1, 2015
ABC: Nonresidential construction spending flat in February
The Associated Builders and Contractors forecasts a robust nonresidential construction spending recovery in 2015, despite an underwhelming start.
Office Buildings | Apr 1, 2015
IBM's supercomputer Watson finds new home in Manhattan's Silicon Alley
The new headquarters for the former Jeopardy champ was conceived as a showcase for Watson’s capabilities, and as an inspirational workspace for Millennials and idea generators of all ages.
Sponsored | Fire and Life Safety | Apr 1, 2015
Radiant Heat: The Invisible Killer
Where there’s smoke, there’s fire. Where there’s fire, there’s the deadly threat of radiant heat.